Abstract

Proyek Konstruksi adalah suatu kegiatan yang bertujuan untuk mendirikan suatu bangunan yang membutuhkan sumber daya, baik biaya, tenaga kerja, material dan peralatan. Sehingga dalam pelaksanannya sumber daya merupakan salah satu indikator penting dalam ketercapaian hasil proyek, maka dari itu perlu dilakukan perhitungan Produktivitas untuk Tenaga Kerja untuk mengetahui seberapa baik kualitas tenaga kerja yang melaksankan pekerjaan konstruksi. Perhitungan produktivitas tenaga kerja yang telah dilakukan dalam tugas akhir ini menggunakan metode Time Study. Pengukuran waktu (time study) adalah suatu teknik pengukuran pekerjaan dengan cara mengumpulkan data berdasarkan waktu yang dibutuhkan untuk menyelesaikan suatu pekerjaan. Metode Time Study digunakan untuk menghitung nilai standard time suatu pekerjaan. Observasi lapangan yang dilakukan meliputi pekerjaan penulangan, pekerjaan bekisting, dan pekerjaan pengecoran pada pekerjaan pelat, balok, dan kolom. Perhitungan Time Study dalam tugas akhir ini dimulai dengan menghitung basic time dari suatu pekerjaan lalu dibandingkan dengan perhitungan rate, standard time, relaxation allowances, dan contingency allowances. Hasil yang diperoleh dari penelitian ini adalah nilai standard time dari setiap pekerjaan, nilai standard time pada pekerjaan penulangan kolom, balok, dan pelat yaitu 160,394 menit, 92,456 menit, dan 113,443 menit, nilai standard time pada pekerjaan bekisting kolom, balok, dan pelat yaitu 99,695 menit, 75,134, dan 98,710 menit, dan nilai standard time pada pekerjaan pengecoran kolom, balok, dan pelat yaitu 60,199 menit, 36,579 menit, dan 49,398 menit.. Sedangkan nilai produktivitas tenaga kerja dari setiap pekerjaan yaitu, untuk nilai produktivitas rata-rata pekerjaan penulangan kolom, balok, dan pelat yaitu 618,187 Kg/OH, 411,968 Kg/OH, dan 370,290 Kg/OH untuk nilai produktivitas rata-rata pekerjaan bekisting kolom, balok, dan pelat yaitu 21,4003 m2/OH, 19,297 m2/OH, dan 41,163 m2/OH, sedangkan nilai produktivitas rata-rata pekerjaan pengecoran kolom, balok, dan pelat yaitu 7,461 m3/OH, 4,341 m3/OH, dan 7,293 m3/OH. Berdasarkan hasil analisis didapatkan faktor-faktor yang mempengaruhi produktivitas dari tenaga kerja proyek Apartement Kingland Avenue pada pekerjaan struktur beton bertulang, dalam pengamatan ditemukan ada beberapa faktor yang mempengaruhi yaitu faktor material dan tempat pengerjaan, faktor lingkungan (faktor cuaca), faktor motivasi pekerja dan faktor Relaxation Allowances.
=================================================================================================================================
Construction Project is an activity aimed at erecting a building that requires resources, both cost, labor, materials and equipment. So that in the implementation of resources is one of the important indicators in the achievement of project results, therefore it is necessary to calculate Productivity for Labor to find out how good the quality of labor is carrying out construction work. Time study method were used in this project to calculate The calculation of labor productivity that has been carried out in this final project uses the Time Study method. Time measurement (time study) is a technique to measure workrate by calculating time needed to complete an activityand the output is the standard time to complete an activityto. Field observations including reinforcement activity, formwork activity, and casting concrete work on slab, beam, and column work. The calculation of time study in this final project begins with calculating the basic time of a job and then compared with the calculation of rates, standard time, relaxation allowances, and contingency allowances. The results obtained from this study are the standard time , the standard time on the column, beam, and plate repeating work, which is 160,394 minutes, 92,456 minutes, and 113,443 minutes, the standard time value in column, beam, and plate formwork work is 99,695 minutes, 75,134, and 98,710 minutes, and the standard time value. in the foundry work of columns, beams, and plates, which are 60,199 minutes, 36,579 minutes, and 49,398 minutes. While the labor productivity , namely, for the average productivity time of column, beam, and slab, namely 618,187 Kg / OH, 411,968 Kg / OH, and 370,290 Kg / OH for the average productivity value of column, beam, and plate formwork work, namely 21.4003 m2 / OH, 19.297 m2 / OH, and 41.163 m2 /OH, while the average productivity value of column, beam, and plate casting work is 7,461 m3/OH, 4,341 m3/OH, and 7,293 m3/OH. Based on the results of the analysis, factors were obtained that affect the productivity of the Kingland Avenue Apartment project workforce on reinforced concrete structure work, in the observations it was found that there were several influencing factors, namely material factors and workplaces, environmental factors (weather factors), worker motivation factors and relaxation allowances factors.

Item Type: Thesis (Other)
Uncontrolled Keywords: Produktivitas, Tenaga Kerja, Time Study, Struktur Beton Bertulang, Productivity, Labor, Time Study, Reinforced Concrete Structure
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD56.25 Industrial efficiency--Measurement. Industrial productivity--Measurement.
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Mr. Marsudiyana -
Date Deposited: 09 Jan 2026 06:44
Last Modified: 09 Jan 2026 06:44
URI: http://repository.its.ac.id/id/eprint/129418

Actions (login required)

View Item View Item