Desain Modifikasi Struktur Menara Bri Medan Dengan Me Nggunakan Metode Beton Pracetak

Driatama, Ihza Hafiz (2022) Desain Modifikasi Struktur Menara Bri Medan Dengan Me Nggunakan Metode Beton Pracetak. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111840000110-Undregraduate_thesis.pdf] Text
03111840000110-Undregraduate_thesis.pdf
Restricted to Repository staff only

Download (9MB) | Request a copy

Abstract

Menara BRI Medan merupakan gedung perkantoran yang memiliki 11 lantai dan 2 lantai basement. Pembangunan Menara BRI Medan dilakukan dengan metode beton cor di tempat atau cor in situ. Dalam tugas akhir ini akan dilakukan modifikasi perencanaan Menara BRI Medan dengan menggunakan beton pracetak, diharapkan dengan menggunakan metode beton pracetak akan didapatkan waktu pekerjaan yang lebih cepat dan dapat memperkecil faktor external tanpa mengurangi mutu dari perancangan awal. Sistem struktur yang digunakan merupakan sistem struktur pemikul momen khusus dan dinding geser beton bertulang. Perencanaan pada tugas akhir memiliki dasar acuan seperti SNI 2847:2019 sebagai dasar perhitungan beton struktural, SNI 1726:2019 sebagai dasaran perhitungan gempa, SNI 1727:2020 sebagai dasar untuk pembebanan struktur, dan PCI Handbook sebagai dasaran perencanaan perhitungan elemen beton pracetak. Sistem sambungan antara tower crane dengan elemen pracetak (balok induk, balok anak, pelat) menggunakan HALFEN precast lifting and fixing systems, sedangkan pengangkatan kolom menggunakan COLIFT mounting system oleh PEIKKO. Sambungan antar elemen pracetak menggunakan sambungan MODIX rebar coupler oleh PEIKKO dan dipasangkan dengan panjang penyaluran. Sambungan antar kolom menggunakan NMB splice sleeve. Direncanakan 12 tipe balok induk pracetak, 5 tipe kolom interior dan eksterior, 12 tipe pelat pracetak, dan 7 jenis elemen balok anak pracetak. Sebagai program bantu analisa struktur, penulis menggunakan SAP2000, ETABS 18, SpColumn, seta GEO 5 untuk perhitungan struktur bawah.
=========================================================================================================================================
BRI Tower in Medan is an office building that has 11 floors and 2 basement floors. The construction of the BRI Medan Tower was carried out using the cast-in-place method. In this final project, the construction of BRI Tower will be carried out using precast concrete, it is hoped that using the precast concrete method will get a faster work time and can minimize external factors without reducing the quality of the initial design. The structural system used is a special moment bearing structure system and reinforced concrete shear walls or called dual systems. This final project took reference from SNI 2847:2019 as the basis for calculating structural concrete, SNI 1726:2019 as the basis for calculating earthquakes, SNI 1727:2020 as the basis for structural loading, and PCI Handbook as the basis for planning the calculation of precast concrete elements. The connection system between the tower crane and precast elements (main beams, subsidiary beams, plates) uses HALFEN precast lifting and fixing systems, while the column lifts use the COLIFT mounting system by PEIKKO. Connections between precast elements use MODIX rebar coupler joints by PEIKKO and are paired with channel lengths. Connection between columns using NMB splice sleeve. The structural will be planned to have 12 types of precast main beams, 5 types of interior and exterior columns, 12 types of precast slabs, and 7 types of precast sub-beam elements are planned. As a structural analysis aid program, the authors use SAP2000, ETABS 18, SpColumn, and GEO 5 for substructure calculations.

Item Type: Thesis (Other)
Uncontrolled Keywords: Beton Pracetak, DPT, Sambungan, Sistem Ganda, Connection, Dual system, Precast Element, Retaining Wall.
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA444 Reinforced concrete
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Mr. Marsudiyana -
Date Deposited: 13 Jan 2026 07:31
Last Modified: 13 Jan 2026 07:31
URI: http://repository.its.ac.id/id/eprint/129566

Actions (login required)

View Item View Item