Santoso, Raynaldi Putra Noer (2022) Analisis Perbandingan Estimasi Waktu Dan Biaya Pelaksanaan Dengan Metode Manual Dan Permodelan Building Information Modeling (Studi Kasus : Proyek Pembangunan Jembatan Sungai Serayu Pegalongan – Mandirancan Tahap II Kabupaten Banyumas). Diploma thesis, Institut Teknologi Sepuluh Nopember.
|
Text
10111810010010-Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only Download (64MB) | Request a copy |
Abstract
Revolusi Industri 4.0 merupakan salah satu revolusi yang membawa perubahan luar biasa bagi individu, industri, dan negara. Beberapa hal penting yang digunakan dalam teknologi Revolusi Industri 4.0 adalah Artificial Intelligence (AI), Big Data, Internet of Things (IoT), quantum computing, dll. Salah satu inovasi dan penerapan teknologi Revolusi Industri 4.0 dalam bidang industri konstruksi adalah Building Information Modeling (BIM). Dewasa ini kita mengetahui bahwasannya proyek konstruksi di Indonesia sering terjadi perubahan desain dari perencanaan awal yang mengakibatkan perbedaan volume item, durasi, dan biaya pekerjaan. Akan sangat susah jika mengulangi proses hal tersebut mulai dari awal seperti menggambar, menghitung, dan melaksanakan. Apalagi jika pekerjaan tersebut ingin segera dilaksanakan secepat mungkin. Dikarenakan hal tersebut bisa terjadinya human error dalam perhitungan yang bisa mengakibatkan kesalahan sehingga volume, durasi, dan biaya berbeda dari perubahan desain yang ditentukan. Tentunya hal tersebut bisa diantisipasi jika menggunakan BIM, yang mana penggunaan BIM sangat praktis dan mudah jika dibandingkan dengan perhitungan konvensional. BIM bisa mengeluarkan output mulai dari 2D sampai 7D, sehingga dalam satu aplikasi saja semua perhitungan bisa terselesaikan dengan cepat. Hasil dari penelitian ini didapatkan penambahan sebesar 4.4% pada volume beton jika menggunakan perhitungan BIM dari 2484.44 m³ menjadi 2594.8 m³ dengan deviasi sebesar 110.36 m³. Sedangkan pada baja tulangan adanya pengurangan sebesar 9% pada volume tulangan dari 297672.54 kg menjadi 271960.8 kg dengan deviasi sebesar 25712 kg, dan pada truss baja adanya pengurangan volume sebesar 3.89% dari 283286 kg menjadi 272670.3 kg dengan deviasi sebesar 10,616 kg. Dengan adanya perubahan volume maka berubah pula biaya dikarenakan efek domino yang mana biaya awal Rp 11,621,916,810.90 menjadi Rp 11,535,514,179.58 dengan deviasi Rp. 86,402,631.32 sehingga ada penurunan biaya sebesar 0.74%. Sehingga dapat diambil kesimpulan bahwasannya pada volume beton terdapat penambahan dikarenakan ada beberapa item pekerjaan yang tidak simetris yang sulit ketika dihitung secara manual, sedangkan pada volume baja tulangan terjadi pengurangan dikarenakan ketika mendesain mengetahui apakah tulangan tersebut bisa digambar pada item pekerjaan atau tidak.
===================================================================================================================================
The Industrial Revolution 4.0 is one of the revolutions that brings extraordinary changes to individuals, industries, and countries. Some of the important things used in the Industrial Revolution 4.0 technology are Artificial Intelligence (AI), Big Data, Internet of Things (IoT), quantum computing, etc. One of the innovations and application of Industrial Revolution 4.0 technology in the construction industry is Building Information Modeling (BIM). Today we know that construction projects in Indonesia often experience changes in design from the initial planning which result in differences in item volume, duration, and work costs. It would be very difficult to repeat the process from scratch such as drawing, calculating, and executing. Especially if the work is to be carried out as soon as possible. Due to this, human error can occur in calculations which can result in errors so that the volume, duration, and cost are different from the specified design changes. Of course, this can be anticipated if using BIM, where the use of BIM is very practical and easy when compared to conventional calculations. BIM can produce output ranging from 2D to 7D, so that in one application all calculations can be completed quickly. The results of this study showed that there was an increase of 4.4% in the volume of concrete when using the BIM calculation from 2484.44 m³ to 2594.8 m³ with a deviation of 110.36 m³. While for reinforcing steel there is a 9% reduction in the volume of reinforcement from 297672.54 kg to 271960.8 kg with a deviation of 25712 kg, and in steel truss there is a 3.89% reduction in volume from 283286 kg to 272670.3 kg. With the change in volume, the costs also change due to the domino effect where the initial cost is Rp. 11,621,916,810.90 to Rp. 11,535,514,179.58 with a deviation of Rp. 86,402,631.32 so there is a decrease in costs of 0.75%. So it can be concluded that in the volume of concrete there is an increase because there are some work items that are not symmetrical which are difficult when calculated manually, while the volume of reinforcing steel is reduced because when designing we know whether the reinforcement can be drawn on the work item or not.
| Item Type: | Thesis (Diploma) |
|---|---|
| Additional Information: | RSIS 624.25 San a-1 2022 3100022095732 |
| Uncontrolled Keywords: | BIM, perbandingan, volume, durasi, biaya, comparison, time, cost |
| Subjects: | T Technology > TE Highway engineering. Roads and pavements > TE250.P475 Pavements--Design and construction--Estimates. T Technology > TE Highway engineering. Roads and pavements > TE7 TG300 Bridges--Design and construction. T Technology > TH Building construction > TH438.13 Building information modeling. |
| Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D4) |
| Depositing User: | Anis Wulandari |
| Date Deposited: | 14 Jan 2026 07:26 |
| Last Modified: | 14 Jan 2026 07:26 |
| URI: | http://repository.its.ac.id/id/eprint/129621 |
Actions (login required)
![]() |
View Item |