Sulaksono, Nugroho Budi (2026) Perencanaan Energy Gas Storage pada Sistem Kelistrikan Pulau Ambon Propinsi Maluku. Masters thesis, Institut Teknologi Sepuluh Nopember.
|
Text
6047212002-Master_Thesis.pdf - Accepted Version Restricted to Repository staff only Download (6MB) | Request a copy |
Abstract
Sistem Kelistrikan Pulau Ambon adalah salah satu sistem kelistrikan terbesar di Propinsi Maluku dengan melayani 500.000 pelanggan. Saat ini sistem kelistrikan di Pulau Ambon memiliki pembangkit dengan daya mampu 80 MW (PLTMG dan PLTD) dengan beban puncak sistem 60 MW. Penopang utama sistem kelistrikan di Pulau Ambon saat ini adalah Pembangkit Listrik Tenaga Mesin dan Gas (PLTMG) Ambon Peaker 30 MW dan sisanya ditopang oleh PLTD-PLTD yang saat ini beroperasi menggunakan bahan bakar biodiesel B30. Untuk memenuhi kebutuhan listrik masyarakat ke depannya serta memperkuat sistem kelistrikan di Pulau Ambon, PT PLN (Persero) saat ini sedang merencanakan pembangunan tambahan PLTMG Ambon 2 dengan kapasitas daya terpasang sebesar 50 MW dimana masing-masing PLTMG ini menggunakan sistem bahan bakar dual fuel dan Barge Mouted Power Plant (BMPP) Nusantara 1 sebesar 60 MW yang saat ini proses pembangunan, PT PLN (Persero) juga akan membangun Pembangkit Listrik Tenaga Surya (PLTS) yang berlokasi tidak jauh dari PLTMG Ambon Peaker dan PLTMG Ambon 2 serta rencana PLTP Tulehu (2x10 MW) saat ini proses explorasi. Untuk merencanakan Energy Storage dengan menggunakan Gas pada Sistem Kelistrikan Pulau Ambon adalah salah satu pulau terisolasi secara geografis yang akan menghadapi tantangan didalam pasokan energi listrik yang stabil dan terjangkau . Didalam perencanaan ini saya akan menggunakan metode pendekatan dengan berbasis Mixed Integer Linear Programming (MILP) sehingga diharapkan mendapatkan hasil yang optimal didalam perencanaan Energy Gas Storage dengan berbasis gas. Jadi untuk meningkatkan kehandalan sistem operasi dan Efisiensi pada PLTMG – PLTMG tersebut maka disiapkan Energy Storage dalam bentuk pembangunan Fasilitas Regasifikasi di Pulau Ambon untuk mendukung program pemerintah menghapus penggunaan BBM menjadi GAS, mengurangi emisi gas rumah kaca dan mendukung transisi energi hijau menuju sistem kelistrikan yang berkelanjutan.
=================================================================================================================================
Electricity system on Ambon Island is one of the biggest electricity on Maluku and serve for 500.000 customers. Nowadays electricity system on Ambon Island have some power plants which capable to generate 80 MW (PLTMG and PLTD) on 60 MW system’s peak load. The main power plant is Gas and Diesel Engine Power Plant (PLTMG) Ambon Peaker 30 MW and the rest is carried by some Diesel Power Plants that use B30 as main fuel. In order to fulfill the customers future needs and strengthening electricity system on Ambon Island, PT PLN (Persero) is planning to build a new power plant, PLTMG Ambon 2 50 MW. Each of these PLTMG will use dual fuel as their energy source and Barge Mounted Power Plant (BMPP) Nusantara 1 60 MW is now being built. PT PLN (Persero) is also planning to build Solar Power Plant, near to PLTMG Ambon Peaker 30 MW and PLTMG Ambon 2 50 MW, and also PLTP Tulehu 2X10 MW that is now in exploration process. Using gas as a part of energy storage planning on Ambon Island’s electricity system is a solution to solve the fact that Ambon Island is geographically one of the most isolated island and will facing the future of stable and affordable electricity. In this thesis, we will use approaching method called Mixed Integer Linear Programming (MILP) to gain optimize result on gas energy storage system planning. Thus, to increase reliability of operation system and efficiency on PLTMGs, energy storage system will be execute as regasification facility on Ambon Island. The purposes of the development are to decrease and change using diesel fuel to gas fuel as a main fuel (support government’s policy), decrease emission and be a part of energy transition for sustainable electricity.
| Item Type: | Thesis (Masters) |
|---|---|
| Uncontrolled Keywords: | Kata kunci: Sistem Kelistrikan Pulau Ambon, Energy Storage, Pembangkit Listrik Tenaga Mesin Gas (PLTMG), Gas, Regasifikasi, Mixed Integer Linear Programming (MILP) Keywords: Electricity System on Ambon Island, Energy Storage, Gas and Diesel Engine Power Plant (PLTMG), Gas, Regasification, Mixed Integer Linear Programming (MILP). |
| Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1001 Production of electric energy or power |
| Divisions: | Interdisciplinary School of Management and Technology (SIMT) > 78201-System And Technology Innovation |
| Depositing User: | Nugroho Budi Sulaksono |
| Date Deposited: | 06 Feb 2026 02:06 |
| Last Modified: | 06 Feb 2026 02:06 |
| URI: | http://repository.its.ac.id/id/eprint/132214 |
Actions (login required)
![]() |
View Item |