Indriani, Hotna (2022) Analisis Risiko Kesehatan Dan Keselamatan Kerja Pada Proyek Instalasi Pengolahan Air Limbah (IPAL) Di PT XYZ Dengan Metode Bow Tie Analysis (BTA) Dan Failure Mode Effect Analysis (FMEA). Other thesis, Institut Teknologi Sepuluh Nopember.
|
Text
02411840000015-Undergraduate_Thesis.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
Abstract
Pekerjaan konstruksi merupakan salah satu pekerjaan yang berkaitan erat dengan Kesehatan dan Keselamatan Kerja (K3). Menurut data yang didapatkan dari Menteri Ketenagakerjaan, terdapat peningkatan kasus kecelakaan kerja di bidang konstruksi dari tahun 2019 ke tahun 2020 yaitu sebanyak 114.000 kasus menjadi 177.000 kasus. PT XYZ merupakan perusahaan BUMN yang bergerak di bidang konstruksi. Pada tahun 2022 PT XYZ diberikan tanggungjawab untuk menyelesaikan proyek IPAL di Kota Palembang. Pada proses pengerjaan proyek IPAL, sudah terjadi empat kasus kecelakaan kerja, salah satunya mengakibatkan pekerja harus kehilangan satu ruas jari tangannya. Oleh karena itu, penelitian ini dilakukan dengan tujuan untuk mengidentifikasi risiko yang berkaitan dengan proses instalasi pengolahan air limbah dengan menggunakan metode Bow Tie Analysis (BTA) dan Failure Mode Effect Analysis (FMEA). BTA merupakan metode yang digunakan untuk menggambarkan bahaya, risiko, penyabab dan akibat kejadian dalam sebuah diagaram. Sedangkan FMEA merupakan sebuah metode yang digunakan untuk memberikan penilaian terhadap risiko yang telah dilakukan identifikasi. Kedua metode tersebut digunakan bersamaan untuk saling melengkapi proses identifikasi bahaya dan risiko pada pengerjaan proyek IPAL. Pada pengolahan data diketahui bahwa terdapat sebanyak 54 jenis risiko dari 25 jenis urutan pengerjaan proyek IPAL. Pengerjaan proyek IPAL ditemukan sebanyak 18% risiko dengan tingkat high risk, 55% risiko dengan tingkat medium risk dan 27% risiko dengan tingkat low risk. Hasil identifikasi tersebut akan memberikan rekomendasi langkah penanganan yang tepat untuk setiap risiko yang ada pada proses instalasi pengolahan air limbah.
================================================================================================================================
Construction work is one of the jobs that are closely related to Occupational Health and Safety (OHS). According to the Indonesian Ministry of Manpower, there was an increase in cases of work accidents in the construction sector from 2019 to 2020, from 114,000 cases to 177,000 cases. PT XYZ is one of Indonesia’s state owned construction company. In 2022, PT XYZ has given responsibility to work on a WWTP (Wastewater Treatment Plant) project in Palembang, South Sumatra. In the process of working on WWTP project, there have been 4 cases of work accidents, one of which causes the worker to lose a finger joint. Therefore, this study was conducted with the aim of identifying risks associated with the wastewater treatment plant process using the Bow Tie Analysis (BTA) and Failure Mode Effect Analysis (FMEA) methods. BTA is a method used to describe hazards, risks, causes and effects of events in a diagram. While FMEA is a method used to provide an assessment of the risks that have been identified. Both methods are used to identify hazard and risk in WWTP project. In the chapter of data processing, it is known that there are as many as 54 types of risks from 25 types of sequences for WWTP project. WWTP project was found to have 18% risk with a high risk level, 55% risk with a medium risk level and 27% risk with a low risk level. This identification result will provide recommendations for appropriate mitigation steps for every risk in the wastewater treatment plant process.
| Item Type: | Thesis (Other) |
|---|---|
| Uncontrolled Keywords: | Kecelakaan kerja, konstruksi, IPAL, Mitigasi, Risiko, Work accident, construction, WWTP, Mitigation, Risk |
| Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management |
| Divisions: | Faculty of Industrial Technology and Systems Engineering (INDSYS) > Industrial Engineering > 26201-(S1) Undergraduate Thesis |
| Depositing User: | Mr. Marsudiyana - |
| Date Deposited: | 06 Feb 2026 07:10 |
| Last Modified: | 06 Feb 2026 07:10 |
| URI: | http://repository.its.ac.id/id/eprint/132233 |
Actions (login required)
![]() |
View Item |
