Analisis Waktu dan Biaya Proyek Pembangunan Gedung Perkuliahan Universitas Muhammadiyah Lamongan Dengan Modifikasi Half Slab Precast

Fitriana, Nur Laili (2022) Analisis Waktu dan Biaya Proyek Pembangunan Gedung Perkuliahan Universitas Muhammadiyah Lamongan Dengan Modifikasi Half Slab Precast. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111810013006-Undergraduate_Thesis.pdf] Text
10111810013006-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only

Download (17MB) | Request a copy

Abstract

Gedung Perkuliahan Universitas Muhammadiyah Lamongan akan menjadi bangunan tertinggi di wilayah Lamongan setelah gedung Pemkab Lamongan. Gedung ini rencananya akan dibangun setinggi 78,03 m dengan jumlah lantai sebanyak 15 dengan pekerjaan pelat eksistingnya menggunakan metode cor konvensional. Dengan kondisi struktur pelat tipikal dari lantai 2 s/d 12 maka memungkinkan untuk dimodifikasi dengan half slab precast sesuai dengan karya tulis Wijaksono et al., pada tahun 2018, yang menyatakan bahwa metode tersebut lebih cepat pelaksanaannya dibandingkan dengan metode cor konvensional. Sehingga pada tugas akhir ini dilakukan analisis perbandingan waktu dan biaya pelaksanaan dari pekerjaan struktur pelat dengan metode konvensional dan metode half slab precast, dengan tujuan untuk mengetahui apakan dengan metode alternatif half-slab precast dapat mereduksi waktu dan biaya dari pekerjaan pelat konvensional. Proses perhitungan dimulai dari penentuan work breakdown structure, analisis half slab precast, perhitungan volume, perhitungan produktivitas, perhitungan durasi, penjadwalan dengan menggunakan ms project, dan perhitungan biaya pelaksanaan. Hasil analisis menunjukkan bahwa waktu yang diperlukan untuk menyelesaikan proyek dengan metode pengecoran konvensional selama 303 hari lebih lama jika dibandingkan dengan pengecoran dengan metode half slab precast, yaitu 246 hari. Namun dari unsur biaya pelaksanaan, metode pengecoran half slab precast dengan biaya Rp. 31.651.703.000 lebih mahal jika dibandingkan dengan biaya pelaksanaan dengan metode pengecoran konvensional yaitu dengan biaya Rp. 30.770.283.000.
===============================================================================================================================================
The Lamongan Muhammadiyah University Lecture Building will be the tallest building in the Lamongan area after the Lamongan Regency Government building. This building is planned to be built as high as 78.03 m with a total of 15 floors with the existing slab work using the conventional cast method. With the condition of a typical slab structure from floors 2 to 12, it is possible to modify it with half slab precast according to the paper of Wijaksono et al., in 2018, which stated that this method is faster to implement than the conventional cast method. So that in this final project a comparative analysis of the time and cost of implementation of the slab structure work with the conventional method and the half slab precast method is carried out, with the aim of knowing whether the alternative half-slab precast can reduce the time and cost of conventional slab work. The calculation process starts from determining the work breakdown structure, half slab precast analysis, volume calculation, productivity calculation, duration calculation, scheduling using MS project, and calculating implementation costs. The results of the analysis show that the time required to complete the project using the conventional casting method is 303 days longer than the half slab precast casting method, which is 246 days.casting method half slab precast costs Rp. 31,651,703,000 more expensive when compared to the implementation costs with conventional casting methods, namely at a cost of Rp. 30,770,283,000

Item Type: Thesis (Other)
Additional Information: RSIS 692.5 Fit a-1 2022 3100022095738
Uncontrolled Keywords: Analisis Waktu dan Biaya, Half-Slab Precast, Konvensional, Time and Cost Analysis, Half Slab Precast, Conventional
Subjects: T Technology > TH Building construction > TH1461 Concrete construction.
T Technology > TH Building construction > TH437 Building--Cost control.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: ansi aflacha
Date Deposited: 26 Feb 2026 04:54
Last Modified: 26 Feb 2026 04:54
URI: http://repository.its.ac.id/id/eprint/132637