Analisa Proyeksi Kebutuhan Energi Listrik Dan Potensi Pemanfaatan Arus Laut Sebagai Sumber Energi Memenuhi Kebutuhan Listrik Di Kabupaten Flores Timur

Ramadhani, Cindi (2022) Analisa Proyeksi Kebutuhan Energi Listrik Dan Potensi Pemanfaatan Arus Laut Sebagai Sumber Energi Memenuhi Kebutuhan Listrik Di Kabupaten Flores Timur. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 04211840000095-Undergraduate_Thesis.pdf] Text
04211840000095-Undergraduate_Thesis.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy

Abstract

Nilai rasio elektrifikasi di Indonesia timur masih cukup rendah contoh Nusa Tenggara Timur sebesar 73% akibat daerah yang berupa pulau – pulau kecil dengan akses dan infrastruktur yang minim. Melihat dari morfologi Kawasan di daerah timur khususnya Nusa Tenggara Timur memiliki potensi karena terdiri dari daratan-daratan kecil dan perairan selat yang sempit mengapit kedua pulau, sehingga menciptakan peluang munculnya arus yang optimal untuk dimanfaatkan sebagai energi pembangkit. Salah satu potensi energi arus laut sebagai energi terbarukan dimiliki oleh Selat Larantuka, Flores Timur, Nusa tenggara timur. Kecepatan arus di Selat Larantuka relative besar, yaitu berkisar 0.004 m/s hingga 3.676 m/s. Saat ni dikembangkan proyek FLITE (Feasibility of Larantuka and Indonesian Tidal Energy) yang bekerja sama antara NOVA Innovation dengan ITS dalam mengembangkan pembangkit dengan kapasitas 100 kW, proyek yang akan memberikan studi kelayakan untuk susunan pasang surut 7MW di Selat Larantuka. Pada penelitian inni menggunakan metode regresi linear berganda untuk menghitung prediksi kebutuhan listrik. Variabel yang digunakan adalah PDRB dan pelanggan listrik sebagai variabel bebas, serta jumlah listrik terjual sebagai variabel terikat. Perhitungan prediksi kebutuhan listrik dihitung pada tahun 2021-2035. Berdasarkan hasil perhitungan, PDRB mengalami kenaikan sebesar 4% pertahunnya, dan jumlah pelanggan mengalami kenaikan sebesar 4.3%. Selanjutnnya dilakukan perhitungan untuk menentukan konstanta dan koefisien regresi linear berganda. Didapatkan konstanta (a) sebesar -3133.49, koefisien refresi sebesar 1.87 (b1) dan 0.042 (b2). Berdasarkan hasil prediksi disimpulkan bahwa kebutuhan listrik (jumlah listrik terjual) di Kabupaten Flores Timur mengalami rata-rata kenaikan 5% per tahun atau sebesar 500 kW setiap tahunnya. Selanjutnya dilakukan uji-T dan uji-F dengan kesimpulan PDRB dan pelanggan listrik menjadi faktor yang mempengaruhi tingkat kebutuhan listrik dengan korelasi sebesar 95.5%. Berdasarkan survey tahun 2022, daya mampu yang dihasilkan oleh PLN sebesar 8060 kW, dimana menurut hasil prediksi kebutuhan listrik untuk Kab. Flores Timur hanya mampu mensupply hingga tahun 2023, sedangkan untuk tahun 2024 kebutuhan listrik 8102 kW. Selat Larantuka memiliki potensi mencapai 241 MW kecepatan arus maksimal 3.4 m/s dengan potensial area sebesar 0.29 km3, dan nilai rapat daya sebesar 13.8 kW/m2.
==============================================================================================================================
The value of the electrification ratio in eastern Indonesia is still quite low, for example East Nusa Tenggara at 73% due to the area in the form of small islands with minimal access and infrastructure. Judging from the morphology, the area in the eastern region, especially East Nusa Tenggara, has potential because it consists of small lands and narrow strait waters flanking the two islands, thus creating opportunities for the emergence of optimal currents to be used as energy generators. One of the potential energy of ocean currents as renewable energy is owned by the Larantuka Strait, East Flores, East Nusa Tenggara. The current velocity in the Larantuka Strait is relatively large, ranging from 0.004 m/s to 3,676 m/s. Currently, the FLITE (Feasibility of Larantuka and Indonesian Tidal Energy) project is being developed in collaboration between NOVA Innovation and ITS in developing a power plant with a capacity of 100 kW, a project that will provide a feasibility study for a 7MW tidal arrangement in the Larantuka Strait. This research uses multiple linear regression method to calculate the prediction of electricity demand. The variables used are GRDP and electricity customers as independent variables, and the amount of electricity sold as the dependent variable. The prediction of electricity demand is calculated in 2021-2035. Based on the calculation results, GRDP has increased by 4% per year, and the number of customers has increased by 4.3%. Furthermore, calculations are carried out to determine the constants and coefficients of multiple linear regression. The constant (a) is - 3133.49, the refraction coefficient is 1.87 (b1) and 0.042 (b2). Based on the prediction results, it is concluded that the electricity demand (amount of electricity sold) in East Flores Regency has an average increase of 5% per year or 500 kW per year. Then the T-test and F-test were carried out with the conclusion that GRDP and electricity customers were the factors that affected the level of electricity demand with a correlation of 95.5%. Based on the 2022 survey, the capable power produced by PLN is 8060 kW, where according to the prediction results of electricity demand for Kab. East Flores is only able to supply until 2023, while for 2024 the electricity demand is 8102 kW. The Larantuka Strait has the potential to reach 241 MW with a maximum current speed of 3.4 m/s with a potential area of 0.29 km3, and a power density of 13.8 kW/m2.

Item Type: Thesis (Other)
Additional Information: RSSP 621.312 134 Ram a-1 2022, - 3100022096543
Uncontrolled Keywords: Arus Laut, Energi Baru Terbarukan, Proyeksi, Regresi Linear, Tidal Energy, Renewable Energy, Projection, Linear Regression
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1519.S68 Hydroelectric power plants
Divisions: Faculty of Marine Technology (MARTECH) > Marine Engineering > 36202-(S1) Undergraduate Thesis
Depositing User: Mr. Marsudiyana -
Date Deposited: 26 Feb 2026 07:54
Last Modified: 26 Feb 2026 07:54
URI: http://repository.its.ac.id/id/eprint/132647

Actions (login required)

View Item View Item