Mukhlis, Miftahul (2025) Desain Perencanaan Instalasi Scaffolding Jenis Tubular Sebagai Akses Inspeksi pada Marine Loading Arm (MLA) PT. Shell Indonesia di Kawasan Jetty 1 PT. Siam Maspion Terminal. Project Report. [s.n.], [s.l]. (Unpublished)
|
Text
2039221016-Project_Report.pdf - Accepted Version Restricted to Repository staff only Download (7MB) | Request a copy |
Abstract
Perencanaan instalasi scaffolding jenis tubular (Tube & Coupler) dilakukan untuk menyediakan akses inspeksi pada Marine Loading Arm (MLA) 0602 di Jetty 1 PT. Siam Maspion Terminal. Tahapan perancangan dikerjakan secara runtut, mulai dari survei lapangan, pemodelan 3D, hingga pembuatan Detail Engineering Drawing (DED) menggunakan Autodesk Inventor. Spesifikasi material menggunakan pipa galvanis standar BS 1139 dengan acuan perhitungan berdasarkan AS/NZS 1576.1 dan BS EN 12811. Evaluasi kelayakan struktur disimulasikan pada SAP2000 dengan memasukkan parameter kombinasi pembebanan: beban mati, beban hidup (medium duty 320 kg), serta beban angin ekstrem 30-50 knots. Hasil analisis menunjukkan nilai defleksi vertikal, defleksi horizontal, dan tegangan elemen pipa berada jauh di bawah ambang batas toleransi maksimal. Struktur scaffolding terverifikasi aman (safe to work), sangat layak secara teknis, dan memenuhi kriteria Keselamatan dan Kesehatan Kerja (K3) untuk diimplementasikan secara operasional.
==================================================================================================================================
The installation planning of tubular scaffolding (Tube & Coupler) was carried out to provide inspection access for the Marine Loading Arm (MLA) 0602 at Jetty 1 of PT. Siam Maspion Terminal. The design phases were executed sequentially, starting from the site survey and 3D modeling, up to the generation of Detailed Engineering Drawings (DED) using Autodesk Inventor. The material specification utilized galvanized pipes according to the BS 1139 standard, with structural calculations referencing AS/NZS 1576.1 and BS EN 12811. Structural feasibility was simulated in SAP2000 by applying load combination parameters: dead load, live load (medium duty 320 kg), and extreme wind loads of 30-50 knots. The analysis results indicated that the vertical deflection, horizontal deflection, and pipe element stress values were well below the maximum allowable tolerance limits. The scaffolding structure is verified as safe to work, highly feasible technically, and fully complies with Occupational Health and Safety (OHS) criteria for operational implementation.
| Item Type: | Monograph (Project Report) |
|---|---|
| Uncontrolled Keywords: | Scaffolding, Marine Loading Arm, Autodesk Inventor, SAP2000, Structural Analysis, Tubular Scaffolding, Perancah. |
| Subjects: | Q Science > Q Science (General) > Q325.5 Machine learning. Support vector machines. |
| Divisions: | Faculty of Vocational > Mechanical Industrial Engineering (D4) |
| Depositing User: | Miftahul Mukhlis |
| Date Deposited: | 06 Jul 2026 02:43 |
| Last Modified: | 06 Jul 2026 02:43 |
| URI: | http://repository.its.ac.id/id/eprint/134171 |
Actions (login required)
![]() |
View Item |