Yasmin, Andy (2022) “Perbandingan Waktu Dan Biaya Penggunaan Bekisting Aluminium Dengan Konvensional Pada Proyek Pengembangan Rs Royal Surabaya”. Diploma thesis, Institut Teknologi Sepuluh Nopember.
|
Text
10111810010030-Undergraduate_Thesis.pdf Restricted to Repository staff only Download (10MB) | Request a copy |
Abstract
Penyusunan proyek akhir terapan yang berjudul “Perbandingan waktu dan biaya penggunaan bekisting aluminium dengan konvensional pada proyek pengembangan RS Royal Surabaya” ini menggunakan data bangunan RS Royal Surabaya yang berlokasi di Jl. Rungkut Industri 1 No. 1 Kendangsari, Tenggilis Mejoyo, Surabaya, Jawa Timur. Proyek ini memiliki luas lahan 2.846,79 m2 dan luas bangunan 2.010 m2 dengan 8 lantai. Dalam proyek ini seluruh pekerjaan bekisting menggunakan metode bekisting konvensional. Sedangkan metode pelaksanaan yang digunakan dalam penyusunan proyek akhir terapan adalah dengan metode bekisting aluminium. Bekisting merupakan sebuah alat yang digunakan untuk mencetak sebuah struktur beton dan juga fasilitas penunjang pekerjaan yang dapat menahan beban diatasnya. Jika digunakan secara berulang kali dalam jangka waktu Panjang dapat memungkinkan terjadinya kerusakan. Oleh karena itu perlu dilakukan manajemen pengendalian material yang terbuang akibat kerusakan material agar menjadi lebih terkendali. Jenis bekisting yang digunakan pada proyek akhir ini adalah bekisting Aluminium. Biaya pelaksanaan dihitung berdasarkan Analisis yang sesuai antara literatur yang digunakan maupun peraturan yang berlaku untuk medapatkan kesesuaian dengan kondisi pelaksanaan lapangan. Sedangkan pada perhitungan waktu pelaksanaan dilakukan analisis mulai dari kapasitas produksi, produktivitas, durasi dan penyusunan jadwal setiap pekerjaan dimana hal ini dilakukan dengan menggunakan alat bantu Microsoft Project. Berdasarkan hasil Analisis perhitungan pada proyek pengembangan RS Royal Surabaya diketahui bahwa pekerjaan bekisting aluminium lebih mahal 2,7% dari bekisting konvensional, tetapi dari segi durasi pekerjaan lebih cepat bekisting aluminium. Dari penelitian tersebut dapat disimpulkan biaya penggunaan bekisting aluminium lebih mahal akan tetapi durasi yang dihasilkan relatif lebih cepat.
==============================================================================================================================
The preparation of the applied final project entitled "Comparison of time and cost of using conventional to aluminium formwork on the Surabaya Royal Hospital Development Project" uses data from the Royal Surabaya Hospital building located on Jl. Rungkut Industry 1 No. 1 Kendangsari, Tenggilis Mejoyo, Surabaya, East Java. This project has a land area of 2,846.79 m2 and a building area of 2,010 m2 with 8 floors. In this project all formwork works using conventional formwork methods. While the implementation method used in the preparation of the applied final project is the aluminum formwork method. Formwork is a tool used to print a concrete structure and also work support facilities that can withstand the load on it. If used repeatedly for a long period of time, it can cause damage. Therefore, it is necessary to control the wasted material management due to material damage in order to be more controlled. The type of formwork used in this final project is Aluminum formwork. Implementation costs are calculated based on the appropriate analysis between the literature used and the applicable regulations to obtain conformity with field implementation conditions. While the calculation of execution time is carried out an analysis starting from production capacity, productivity, duration and schedule preparation of each job where this is done using Microsoft Project tools. Based on the results of the calculation analysis on the Royal Surabaya Hospital project, it is known that aluminum formwork work is 2.7% more expensive than conventional formwork, but in terms of work duration, aluminum formwork is faster. From this research, it can be concluded that the cost of using aluminum formwork is more expensive, but the duration produced is relatively faster.
| Item Type: | Thesis (Diploma) |
|---|---|
| Additional Information: | RSIS 692.5 Yas p-1 2022 |
| Uncontrolled Keywords: | Bekisting Aluminium, pekerjaan bekisting, waktu pelaksanaan proyek, biaya pelaksanaan, dan Kurva S. Aluminium Formwork, formwork, project implementation time, implementation cost, and S Curve. |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Faculty of Vocational > 22301-Civil Infrastructure Engineering (D4) |
| Depositing User: | Mr. Marsudiyana - |
| Date Deposited: | 13 Jul 2026 03:09 |
| Last Modified: | 13 Jul 2026 03:09 |
| URI: | http://repository.its.ac.id/id/eprint/134766 |
Actions (login required)
![]() |
View Item |