Ariyaldi, Zhenzi Yan (2022) “Analisis Perbandingan Waktu Dan Biaya Berdasarkan Quantity Take-Off Menggunakan Metode Konvensional Dan Bim [Studi Kasus : Gedung Perpustakaan Politeknik Kesehatan Kemenkes Surabaya] ”. Diploma thesis, Institut Teknologi Sepuluh Nopember.
|
Text
10111810013045-Undergraduate_Thesis.pdf Restricted to Repository staff only Download (18MB) | Request a copy |
Abstract
Pada era digital ini, sebuah proyek konstruksi membutuhkan teknologi yang canggih untuk mempermudah perencanaan bangunan, salah satunya dalam menghitung kuantitas volume sebuah bangunan. Volume bangunan diukur untuk beberapa tujuan, diantaranya berupa estimasi biaya, pengadaan alat, dan jadwal konstruksi perencanaan, adapun pemanfaatan teknologi juga digunakan pada sektor konstruksi yaitu dengan diterapkannya Building Information Modeling untuk membantu perhitungan volume sebuah konstruksi yang lebih efisien dalam segi waktu pengerjaan serta keakuratan perhitungan. Metode yang digunakan untuk memperoleh data dalam penyusunan tugas akhir ini dengan menggunakan dua metode data. Pertama menggunakan data primer yang diperoleh dari observasi lapangan, wawancara, dan dokumentasi. Sedangkan metode yang kedua yaitu data sekunder dengan menggunakan data-data proyek (RKS, shop drawing, dst) dan studi pustaka. Perhitungan waktu dan biaya pelaksanaan antara metode konvensional dan BIM menggunakan referensi utama dari Ir. A. Soedrajat S, Analisa (cara modern) Anggaran Biaya Pelaksanaan Penerbit “Nova” Bandung, referensi dari penlitian terdahulu, dan harga survey di area Kota Surabaya tahun 2021. Penelitian ini meninjau pada proyek pembangunan Perpustakaan Politeknik Kesehatan Kemenkes Surabaya dengan membandingkan metode perencanaan menggunakan metode BIM dan konvensional berdasarkan volume bangunan terhadap waktu dan biaya. Hasil dari tugas akhir ini didapatkan adanya reduksi dengan menggunakan basis perangkat lunak BIM dalam segi biaya sebesar 1.74% serta durasi sebesar 0.49%. sehingga dapat disimpulkan bahwa perhitungan biaya serta durasi konstruksi dengan bantuan perangkat lunak BIM memiliki kelebihan dibandingkan dengan perhitungan menggunakan metode Konvensional/manual.
==============================================================================================================================
In this digital era, a construction project that requires technology to facilitate building planning, one of which is in calculating the quantity of a building. The volume of buildings is measured for several purposes, including cost estimation, equipment procurement, and planning schedules, the use of technology is also used in the construction sector, namely the application of Building Information Modeling to help calculate the volume of a construction which is more efficient in processing time and calculation accuracy. The method used to obtain data in the preparation of this final project is by using two data methods. First, using primary data obtained from field observations, interviews, and documentation. While the second method is secondary data using project data (RKS, shop drawings, etc.) and literature study. Calculation of implementation time and cost between conventional methods and BIM using the main reference from Ir. A. Soedrajat S, Analysis (modern method) Budget for the Implementation of the "Nova" Publisher Bandung, references from previous research, and price surveys in the Surabaya City area in 2021. This study reviews the construction project of the Health Polytechnic Library of the Ministry of Health in Surabaya by comparing the planning method using the BIM and conventional methods based on the volume of the building against time and cost. The result of this final project is that there is a reduction using the BIM software base in terms of cost of 1.74% and duration of 0.49%. so it can be concluded that the calculation of costs and construction duration with the help of BIM software has advantages compared to calculations using conventional/manual methods.
| Item Type: | Thesis (Diploma) |
|---|---|
| Additional Information: | RSIS 692.5 Ari a-1 2022 |
| Uncontrolled Keywords: | Quantity Take-Off, Building Information modeling, Waktu dan Biaya. Quantity Take-Off, Building Information modeling, Time and Cost. |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Faculty of Vocational > 22301-Civil Infrastructure Engineering (D4) |
| Depositing User: | Mr. Marsudiyana - |
| Date Deposited: | 14 Jul 2026 02:41 |
| Last Modified: | 14 Jul 2026 02:41 |
| URI: | http://repository.its.ac.id/id/eprint/134866 |
Actions (login required)
![]() |
View Item |