Abstract

Penelitian ini bertujuan menentukan skenario operasi dan konfigurasi sistem kelistrikan Kabupaten Kepulauan Sangihe setelah rencana integrasi PLTMG Tahuna 1. Kabupaten Kepulauan Sangihe sendiri merupakan Kabupaten Kepulauan yang beroperasi dengan sistem isolated yang terdiri dari beberapa pembangkit PLTD tersebar, PLTM dan PLTS. Kondisi eksisting sistem kelistrikan Kabupaten Kepulauan Sangihe memiliki karakteristik beban yang tersebar dan masih didominasi oleh pembangkit berbahan bakar diesel (PLTD) yang dimana memiliki kekurangan berupa biaya operasi yang besar, kurang ramah lingkungan, serta adanya rencana pengembangan kelistrikan oleh PT PLN (Persero) di Kabupaten Kepulauan Sangihe dengan membangun pembangunan Pembangkit Listrik Tenaga Mesin Gas (PLTM) yang berlokasi di sebelah utara Kabupaten Kepulauan Sangihe. Untuk itu perlu dilaksanakannya beberapa simulasi untuk mendapatkan konfigurasi yang paling baik dari segi keandalan, efisiensi dan lingkungan. Hasil simulasi menunjukkan bahwa konfigurasi terbaik diperoleh pada Objective 50:50:50 dengan Skenario 2, yaitu PLTMG Tahuna 1, PLTD PLN, dan pembangkit sewa beroperasi. Konfigurasi tersebut menghasilkan biaya pokok penyediaan terendah sebesar Rp2.241/kWh, termasuk biaya susut jaringan.
=================================================================================================================================
This study aims to determine the operating scenarios and configuration of the Sangihe Islands electricity system after the planned integration of the Tahuna 1 Gas Engine Power Plant (PLTMG). Sangihe Islands Regency itself operates with an isolated system consisting of several distributed diesel-powered plants, micro-hydro power plants, and solar power plants. The existing electricity system in the Sangihe Islands Regency is characterized by geographically dispersed loads and is still predominantly supplied by diesel-fired power plants (PLTD) which have disadvantages in the form of large operating costs, less environmentally friendly, and the existence of electricity development plans by PT PLN (Persero) in Sangihe Islands Regency by building a Gas Engine Power Plant (PLTMG) located in the north of Sangihe Islands Regency. For this reason, it is necessary to carry out several simulations to obtain the best configuration in terms of reliability, efficiency and the environment. The simulation results show that the best configuration is achieved using the 50:50:50 Objective under Scenario 2, in which Tahuna 1 PLTMG, PLN diesel power plants, and rental power plants are operated. This configuration produces the lowest generation cost of IDR 2,241/kWh, including network losses.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Gas engine power plant, isolated power system, optimal power flow, operational configuration, power system reliability
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1010 Electric power system stability. Electric filters, Passive.
Divisions: Faculty of Electrical Technology > Electrical Engineering > 20101-(S2) Master Thesis
Depositing User: Rm. Dimas Adhi Prabowo
Date Deposited: 31 Jul 2026 01:36
Last Modified: 31 Jul 2026 01:36
URI: http://repository.its.ac.id/id/eprint/137324

Actions (login required)

View Item View Item