PERENCANAAN PROYEK PIPA TRANSMISI GAS GRESIK-SEMARANG

HERDIANTI, WINDA AMALIA (2016) PERENCANAAN PROYEK PIPA TRANSMISI GAS GRESIK-SEMARANG. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 4312100028-Undergraduate_Theses.pdf]
Preview
Text
4312100028-Undergraduate_Theses.pdf

Download (4MB) | Preview

Abstract

Untuk menyukseskan program pemerintah dalam menyediakan 23.000 MegaWatt di seluruh
Indonesia, maka PT.Pertamina Gas membangun pipa transmisi gas Gresik-Semarang. Proyek
ini terdiri dari beberapa aktivitas mulai dari survey hingga re-assesment, sehingga perlu
dibuat suatu penjadwalan untuk mempermudah para staff yaitu dengan metode Critical Path
Method. Pada Critical Path Method ini akan didapatkan jalur kritis suatu proyek. Jalur kritis
berfungsi untuk melihat jalur mana yang memiliki lintasan yang rawan terjadi keterlambatan,
dari jalur kritis inilah dapat disusun sebuah skenario keterlambatan. What If Analysis pada
Critical Path Method digunakan untuk mengetahui jumlah penambahan tenaga kerja dan jam
kerja yang dibutuhkan untuk mengantisipasi keterlambatan. Setelah itu, dilakukan
perbandingan biaya ketika proyek dibiarkan terlambat dengan biaya ketika mengantisipasi
keterlambatan proyek. Pada laporan ini didapatkan biaya mengantisipasi keterlambatan lebih
kecil dibandingkan dengan biaya yang dikeluarkan jika proyek dibiarkan terlambat.
=============================================================================================================
For successing the government program to provide 23,000 megawatts all over the country,
PT.Pertamina Gas building a gas transmission pipeline Gresik-Semarang. The project consists
of several activities from surveys to re-assessment,and its necessary to make a scheduling of
this project to be a guidance for the staff using Critical Path Method. On the Critical Path
Method will obtain the critical path of a project. Critical path functions is knowing the critical
activities that has a big possibility to make a delay in this project. After knowing the critical
path, authors prepared a late scenario to predict the delay. What If Analysis at Critical Path
Method functions is determine the amount of additional manpower and additional manhour
that needed to anticipate delays. After that, compare the cost of the project if it is let to be late
with the cost to anticipate project delays. In this report obtained the cost to anticipate projects
delay is cheaper than the costs of projects late.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Critical Path Method, What If Analysis, CPM, Biaya proyek
Subjects: T Technology > T Technology (General)
T Technology > TC Hydraulic engineering. Ocean engineering
Divisions: Faculty of Marine Technology (MARTECH) > Ocean Engineering > 38201-(S1) Undergraduate Thesis
Depositing User: Mr. Fandika aqsa
Date Deposited: 10 Jan 2017 03:17
Last Modified: 26 Dec 2018 08:36
URI: http://repository.its.ac.id/id/eprint/1428