Analisis Waktu Dan Pembiayaan Perencanaan Pembangunan Jacket Structure (Studi Kasus Di PT. PAL Surabaya Project Kodeco-32)

Rahmadhani, Feriana (2009) Analisis Waktu Dan Pembiayaan Perencanaan Pembangunan Jacket Structure (Studi Kasus Di PT. PAL Surabaya Project Kodeco-32). Other thesis, Institut Teknologi Sepuluh November.

[thumbnail of 4305100031-Undergraduate_thesis.pdf] Text
4305100031-Undergraduate_thesis.pdf
Restricted to Repository staff only

Download (42MB)

Abstract

Dalam proses pembangunan jacket structure banyak faktor yang mempengaruhinya meliputi: waktu atau penjadwalan, peralatan yang dibutuhkan, sumber daya manusia atau jam orang (manhours) dan biaya. Semua faktor yang di atas harus terkendali agar penyelesaian proyek tepat waktu dan mempunyai kualitas yang baik. Akan terasa sulit apabila melihat banyaknya aktivitas yang saling berhubungan antara satu aktivitas dengan aktivitas lainnya. Untuk memecahkan masalah tersebut maka Tugas Akhir ini menganalisis penjadwalan waktu dan mengoptimalkan sumber daya tenaga kerja yang ada serta biaya pada pembuatan jacket structure. Dengan menggunakan CPM (Critical Path Method) dan bantuan software MS.Project Prof 2007. Berdasarkan data-data yang diperoleh dari PT. PAL Surabaya Project Kodeco 32 mengenai biaya, tenaga kerja dll. Analisis pertama dilakukan dengan menggunakan perhitungan manual (CPM) metode lintasan kritis dan untuk mempercepat penyelesaian proyek menggunakan software MS.Project Prof 2007 dengan software ini akan didapatkan waktu dan biaya yang optimal dalam menyelesaikan proyek. Dari hasil analisa maka didapatkan bahwa waktu yang dibutuhkan untuk pembangunan Jacket struktur dengan menggunakan CPM membutuhkan waktu selama 229 hari dan waktu dengan menggunakan MS. Project Prof 2007 diperoleh waktu selama 200 hari, lintasan kritis untuk setiap aktivitas pada perhitungan manual dengan MS. Project Prof 2007 menunjukkan aktivitas yang sama yaitu pada lintasan 35 = 0-1-2-7-15-16-17-18-19-20-36-37-38-39-40-41-44-45-46-48-49-54-55, untuk biaya yang dibutuhkan dengan perhitungan manual dengan CPM adalah sebesar Rp. 9.005.916.672,00, sedangkan dengan menggunakan MS. Project Prof 2007 sebesar Rp. 9.070.176.936,00. Dengan hasil keduanya tidak melebihi budget dari perusahaan namun untuk lebih amannya maka perhitungan yang paling optimal adalah menggunakan MS. Project Prof 2007.
===================================================================================================================================
Many factors influence in building jacket structure that is: time or schedule, required equipment, human resource or manhours and cost. All factors in above must be controlled so that the project can be finished on time and have good quality. It will feel difficult if too much activity which interaction between one activity with other activity. To solve that problem so this final project analyzes about time schedule and optimal of resource labour along with cost at making of jacket structure. By using CPM (Critical Path Method) and use software MS. PROJECT Prof 2007. Be based on obtained data of PT. PAL Surabaya Project Kodeco 32 hitting cost, labour, etc. First analysis conducted by using calculation of manual with CPM (Critical Path Method) and to quicken the solving of project used software MS. PROJECT Prof 2007 with this software will be got optimal cost and time to finishing project. From result of analysis hence got that time required for the development of Jacket structure by using CPM (Critical Path Method) require time during 229 day and time by using MS. PROJECT Prof 2007 obtained time during 200 day, critical path to each activity at calculation of manual with MS. PROJECT Prof 2007 is same activity point out that is at path 35 = 0-1-2-7-15-16-17-18-19-20-36-37-38-39-40-41-44-45-46-48-49-54-55, to the cost which is required with calculation of manual with CPM is result Rp. 9.005.916.672,00, while by using MS. PROJECT Prof 2007 result to Rp. 9.070.176.936,00. With result of both do not exceed budget of company but to be more safely so most optimal calculation using software MS. PROJECT Prof 2007.

Item Type: Thesis (Other)
Additional Information: RSKe 627.980 29 Rah a
Uncontrolled Keywords: CPM(Critica/ Path Methode), waktu, biaya, tenaga kerja, MS.Project Prof2007, jacket struktur, CPM(Critical Path Methode), Time, Cost, Resources, MS.Project Prof 2007, jacket structure.
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC1680 Offshore structures
Divisions: Faculty of Marine Technology (MARTECH) > Ocean Engineering > 38201-(S1) Undergraduate Thesis
Depositing User: magang .
Date Deposited: 07 Oct 2026 08:31
Last Modified: 07 Oct 2026 08:31
URI: http://repository.its.ac.id/id/eprint/145411