Wahono, Rangga (2007) Perencanaan Metode Pelaksanaan Pekerjaan Basement“ The Adiwangsa Residences And Mall” Di Surabaya. Other thesis, Institut Teknologi Sepuluh Nopember.
|
Text
3100100099-Undergraduate_thesis.pdf Restricted to Repository staff only Download (94MB) |
Abstract
Pesatnya pertumbuhan penduduk di Kota Surabaya ditandai dengan meningkatnya pembangunan di berbagai bidang, termasuk bidang perumahan. Sebagai salah satu upaya untuk mengantisipasi keterbatasan lahan, pembangunan apartemen menjadi alternatif yang banyak dikembangkan, salah satunya adalah The Adiwangsa Residences and Mall yang berlokasi di Bukit Darmo Golf Boulevard, Bukit Darmo Golf Estate, Surabaya. Metode penelitian yang digunakan dalam penyusunan tugas akhir ini meliputi perencanaan metode pelaksanaan pekerjaan basement, perhitungan kebutuhan alat berat yang mencakup jumlah alat dan biaya pelaksanaan, serta penyusunan jadwal pekerjaan basement. Penarikan kesimpulan dilakukan berdasarkan hasil perhitungan durasi penyelesaian pekerjaan dan biaya pelaksanaannya. Hasil analisis menunjukkan bahwa pekerjaan pembersihan lahan (land clearing) menggunakan 3 unit bulldozer dengan durasi 1 hari dan biaya alat sebesar Rp9.291.400,00. Pekerjaan galian basement menggunakan 4 unit excavator dan 24 unit dump truck berkapasitas 23,76 m³, dengan durasi 30 hari dan biaya alat sebesar Rp2.144.060.000,00. Pekerjaan pemancangan menggunakan 5 unit crane pancang, dengan durasi 94 hari dan biaya alat sebesar Rp1.190.000.000,00. Pekerjaan struktur menggunakan 4 unit concrete pump, 24 unit truck mixer, 1 unit batching plant, dan 3 unit tower crane, dengan durasi 176 hari kerja, biaya tenaga kerja sebesar Rp1.974.750.750,00, dan biaya alat sebesar Rp1.883.263.000,00. Berdasarkan hasil analisis penjadwalan, total durasi pelaksanaan pekerjaan basement adalah 239 hari kerja, dengan total biaya pelaksanaan sebesar Rp7.402.421.150,00.
===================================================================================================================================
Rapid population growth in Surabaya is reflected in the increasing pace of development across various sectors, including housing. As one approach to addressing limited land availability, apartment construction has become an alternative, exemplified by The Adiwangsa Residences and Mall, located on Bukit Darmo Golf Boulevard, Bukit Darmo Golf Estate, Surabaya. The research methodology used in this final project includes planning the construction methods for basement works, calculating heavy equipment requirements in terms of equipment quantities and construction costs, and preparing a basement work schedule. Conclusions are drawn based on calculations of project completion time and construction costs. The analysis results indicate that land clearing requires three bulldozers, with a duration of one day and equipment costs of IDR 9,291,400. Basement excavation requires four excavators and 24 dump trucks with a capacity of 23.76 m³, with a duration of 30 days and equipment costs of IDR 2,144,060,000. Pile-driving work requires five pile-driving cranes, with a duration of 94 days and equipment costs of IDR 1,190,000,000. Structural work requires four concrete pumps, 24 truck mixers, one batching plant, and three tower cranes, with a duration of 176 working days, labor costs of IDR 1,974,750,750, and equipment costs of IDR 1,883,263,000. Based on the scheduling analysis, the total duration of the basement construction work is 239 working days, with a total construction cost of IDR 7,402,421,150.
| Item Type: | Thesis (Other) |
|---|---|
| Additional Information: | RSS 690.831 4 Wah p 2007 |
| Uncontrolled Keywords: | Metode Pelaksanaan , Alat Berat, Pekerjaan Basement, Construction Method, Heavy Equipment, Basement Work |
| Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD1391 Apartment houses |
| Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis |
| Depositing User: | magang . |
| Date Deposited: | 27 Oct 2026 07:27 |
| Last Modified: | 27 Oct 2026 07:27 |
| URI: | http://repository.its.ac.id/id/eprint/145903 |
Actions (login required)
![]() |
View Item |