R, Zahrial Firman (2010) Modifikasi Perencanaan Gedung Terang Bangsa (STB) Dengan Metode Pracetak (PRECAST) Dan Menggunakan Sistem Rangka Gedung (Building Frame System). Other thesis, Institut Teknologi Sepuluh Nopember.
|
Text
3105100092-Undergraduate_thesis.pdf Restricted to Repository staff only Download (27MB) |
Abstract
Adanya peningkatan kebutuhan pembangunan di Indonesia mendorong berkembangnya metode konstruksi di bidang teknik sipil. Dalant upaya pemenuhan kebutuhan tersebut, tuntutan akan pekerjaan konstruksi yang efektif dan efisien makin besar. Sistem Pracetak, sebagai salah satu metode konstruksi, merupakan altematif tepat karena memiliki keunggulan dalam hal kecepatan, kontrol kualitas, dan kemudahan dalam pelaksanaan. Dalam tugas akhir ini, Gedung STB direncanakan menggunakan metode pracetak pada elemen balok dan pelat. Sedangkan elemen kolom, tcmgga dan poer menggunakan metode cor di tempat.
Modifikasi yang dilakukan pada gedung ini cmtara lain menambah jumlah lantai dalam struktur menjadi 10 lantai, mereduksi bentang balok yang semula 8 meter menjadi 6 meter dan menambahkan elemen dinding geser dalam memikul gaya lateral untuk mengatasi sambungan pracetak yang tidak terlalu kaku. Dari literature yang ada, Sistem sambungan yang akan digunakan pada gedung ini adalah sambungan basah dengan sedikit modifikasi oleh penulis dengan pertimbangan kemudahan pelaksanaan di lapangcm
Jumlah jenis tipe dari elemen struktur yang berbeda dibuat seminimal mungkin. Hal ini dimaksudkan untuk akan mengurangi jumlah cetakan dan menyeragamkan detail penulangan dan sambungan. Akhirnya secara keseluruhan; strnktur gedimg ini tidak hanya ekonomis, tetapi juga kuat dalam menerima gaya gravitasi dan gaya gempa sesuai zona gempa gedung ini berada.
=========================================================================================================================================
The rising of infrastructure demand in Indonesia, encourage the development of construction method in civil engineering. In the realization of it, necessity of effective and efficient construction method is needed. Precast concrete is one of construction methods, it is a right alternative because it has advantages in speed, quality control and easy to do. In this case, STB building will be designed using precast method on beam and plate. And also, the element of column, stair and poer will be designed using conventional method. The modification of this building such as: increasing the number of story become 10 stories, Reduce the length of span from 8 to 6 meters. And also, there is addition of shearwall structure to provide lateral load support because of unrigidity in precast connection. Wet connection will be used in this building considering the simply way to do.
The varians of precast element will be minimized as few as possibly in order to reduce amount of concrete casting and uniforming steel reinforcement and joint detail. The result of this buliding structure has to be economic and strong in order to receive gravity and lateral load vhich the building earthquake force plan.
| Item Type: | Thesis (Other) |
|---|---|
| Additional Information: | RSS 690. 73 ZAH m-1 |
| Uncontrolled Keywords: | Pracetak (precast), Sistem Rangka Gedung (Building Frame System), DindingGeser (Shearwall)., Precast, Building Frame System, Shearwall. |
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TA Engineering (General). Civil engineering (General) > TA645 Structural analysis (Engineering) |
| Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis |
| Depositing User: | magang . |
| Date Deposited: | 29 Oct 2026 03:51 |
| Last Modified: | 29 Oct 2026 03:51 |
| URI: | http://repository.its.ac.id/id/eprint/145994 |
Actions (login required)
![]() |
View Item |