Sistem pengelolaan sampah di Kota Nganjuk saat ini masih terbatas pada perlakuan yang bersifat konvensional, kondisi ini membawa dampak pada jumlah sampah yang tidak terkendali seiring dengan pertumbuhan penduduk di daerah ini. Berdasarkan data dari Dinas Cipta Karya dan Tata Ruang Daerah Kabupaten Nganjuk, jumlah rata-rata sampah yang dibuang ke TPA Kedungdowo mencapai 160 m3/hari. Kondisi ini jika terus dipertahankan tanpa adanya upaya pengurangan volume sampah baik dari sumber sampah maupun di TPA maka kemungkinan lahan pembuangan akan lebih cepat penuh. Studi ini dilakukan dengan menghitung proyeksi jumlah penduduk, menghitung proyeksi timbulan sampah berdasarkan proyeksi jumlah penduduk, menganalisa data dengan pendekatan 3R (Reduce, Reuse, Recycle) menggunakan Material Balance sehingga dapat diketahui volume sampah yang dapat direduksi sebagai sisa residu ke TPA dan kebutuhan tanah penutup. Hasil perhitungan Material Balance menunjukan reduksi sampah sebesar 67,8 % dan sisa residu sebesar 32,2 %. Sisa usia pakai TPA eksisting adalah 1 tahun, sisa usia pakai berdasarkan proyeksi sampah tahun 2009 adalah 1 tahun dan setelah pengolahan menjadi 3 tahun. Kebutuhan tanah penutup adalah 15 % dari volume residu sampah. Sistem pembuangan sampah di TPA Kedungdowo harus ditingkatkan menjadi Controlled Landfill mengingat masalah yang ditimbulkan dan kemampuan biaya.
========================================================================================================================================
The solid waste management system in Nganjuk City is currently still limited to conventional treatments, this condition has an impact on the uncontrolled amount of waste along with the population growth in this region. Based on data from the Department of Cipta Karya and Spatial Planning of Nganjuk Regency, the average amount of waste disposed of to the Kedungdowo Landfill reaches 160 m3/day. If this condition continues to be maintained without any efforts to reduce waste volume either from the waste source or at the landfill, the disposal site is likely to fill up faster. This study was conducted by calculating population projections, calculating waste generation projections based on population projections, analyzing data with the 3R (Reduce, Reuse, Recycle) approach using Material Balance so that the volume of waste that can be reduced as residual waste to the landfill and the need for cover soil can be determined. The results of the Material Balance calculation show a waste reduction of 67.8 % and a residual waste of 32.2 %. The remaining lifespan of the existing landfill is 1 year, the remaining lifespan based on the 2009 waste projection is 1 year and after treatment becomes 3 years. The need for cover soil is 15 % of the residual waste volume. The waste disposal system at the Kedungdowo Landfill must be upgraded to a Controlled Landfill considering the problems caused and financial capabilities.

Item Type: Thesis (Other)
Additional Information: RSS 628.44 Emp e
Uncontrolled Keywords: 3R dengan Material Balance, Usia Pakai TPA, Tanah Penutup, Pembuangan, 3R with Material Balance, Landfill Lifespan, Cover Soil, Disposal
Subjects: H Social Sciences > HE Transportation and Communications > HE355 Traffic engineering
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: magang .
Date Deposited: 29 Oct 2026 08:05
Last Modified: 29 Oct 2026 08:05
URI: http://repository.its.ac.id/id/eprint/146014

Actions (login required)

View Item View Item