PABRIK EKOSEMEN DARI CANGKANG KERANG (ANADARA GRANOSA) SEBAGAI PENGGANTI BATI KAPUR DENGAN PROSES KERING

ELFIATIKA, TITIS PRICILIA and UTAMI, EKO VINDY (2014) PABRIK EKOSEMEN DARI CANGKANG KERANG (ANADARA GRANOSA) SEBAGAI PENGGANTI BATI KAPUR DENGAN PROSES KERING. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2311030075-2311030091-Non_Degree.pdf] Text
2311030075-2311030091-Non_Degree.pdf - Published Version
Restricted to Repository staff only

Download (3MB) | Request a copy

Abstract

Pabrik Ekosemen Cangkang Kerang yang berasal dari
bahan baku penyususnya, antara lain Cangkang Kerang, tanah
liat, pasir silika dan pasir besi dengan kapasitas 450.000
ton/tahun. Pabrik Semen dari Cangkang kerang sendiri didirikan
dengan tujuan memanfaatkan bahan yang tidak terpakai, dalam
hal ini Cangkang Kerang. Lokasi pabrik adalah Brebes (Jawa
Tengah), dipilih berdasarkan bahan baku dan kemudahan
transportasi. Pabrik ini beroperasi selama 24 jam/hari dan 330
hari/tahun.
Proses produksi Ekosemen Cangkang Kerang terdiri dari
4 tahap. Tahap pertama yaitu pre-treatment bahan baku. Tahap
kedua yaitu semua bahan baku disesuaikan proporsi beratnya
lalu dicampur, digiling dan dihomogenisasi. Tahap ketiga yaitu
campuran bahan baku dibakar mencapai suhu 1450oC sehingga
diperoleh terak. Tahap keempat yaitu penggilingan terak,
pencampuran dengan gypsum sehingga diperoleh ekosemen
dengan ukuran 325 mesh.
Untuk mendapatkan kapsitas produk 450.000 ton/tahun
dibutuhkan bahan baku yaitu Cangkang Kerang 1.284.856.20
kg/hari, tanah liat 321.215,30 kg/hari pasir silika 107. 072
kg/hari, pasir besi 71.381,40 kg/hari. Bahan tambahan yaitu
gypsum 64.934,72 kg/hari.

================================================================

Eco-cement plant made of raw material composed of
Shells, clay, silica sand and iron sand has a capacity of 450.000
tons/year. The Eco-cement plant is usefull to reduce waste. The
selected location in Brebes (Central Java) is based on raw
material and the easy of transportation. This plant operates for
24 hours/day and 330 days/year.
The production process of eco-cement consist of 4 stage.
The first step is pre-treatment of raw material. The second stepis
all raw materials are proposed as weight then mixed, ground and
homogenized. Third step is mix of raw material mixis burned to
1450oC to produced clinker. And the last step is clinker grinding,
clinker and gypsum mixing and grinding to get 325 mesh.
The raw material neede due to pruduct capacity of
450.000 tons/year are 1.284.856.20 kg/day of shells, 321.215,30
kg/day of clay, 107. 072 kg/day of silica sand, 71.381,40 kg/day
of irond sand. The additive material is gypsum as many as
64.934,72 kg/day.

Item Type: Thesis (Diploma)
Additional Information: RSK 670.42 Elf p
Uncontrolled Keywords: Ekosemen, Cangkang Kerang, proses kering, Eco-cement, Shells, Dry process
Subjects: T Technology > TP Chemical technology > TP255 Electrochemistry, Industrial.
Divisions: Faculty of Industrial Technology > Chemical Engineering > 24401-(D3) Diploma 3
Depositing User: Anis Wulandari
Date Deposited: 19 Jan 2017 04:42
Last Modified: 19 Jan 2017 04:42
URI: http://repository.its.ac.id/id/eprint/1885

Actions (login required)

View Item View Item