ANALISIS DAN MITIGASI BAHAYA ARC FLASH PADA SISTEM KELISTRIKAN PT. LINDE INDONESIA

NURHIDAYAT, YAHYA (2016) ANALISIS DAN MITIGASI BAHAYA ARC FLASH PADA SISTEM KELISTRIKAN PT. LINDE INDONESIA. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2212100070-undergraduate thesis.pdf]
Preview
Text
2212100070-undergraduate thesis.pdf - Published Version

Download (2MB) | Preview

Abstract

Dalam perhitungan yang berhubungan dengan potensi bahaya arc flash bergantung pada proteksi arus lebih untuk menghilangkan kondisi saat diberi gangguan. Efektivitas berbagai perangkat ditentukan oleh fault clearing time (FCT) terkait dengan gangguan arus maksimum yang ada untuk setiap lokasi sistem. Industri komersial mulai melakukan prosedur pelabelan arc flash dan mulai mengenali pencegahan arc flash sebagai bagian dari program safety, perhitungan current method memungkinkan untuk menghitung incident energy (cal/cm²) terkait dengan gangguan maksimum tiga phasa. Kesalahan terbanyak adalah besaran arus kurang dari besaran arus tiga phasa maksimum. Dalam Tugas Akhir ini akan dibahas perhitungan energi, cara mengurangi energi, protection boundary, pemilihan personal protective equipment (PPE) saat terjadinya arc flash pada sistem kelistrikan PT. Linde Indonesia analisis dilakukan ditegangan menengah.
"============================================================================================="
In calculation of the potential hazards associated with arc flash depends on overcurrent protection to eliminate interference conditions. The effectiveness of the various devices is determined by fault clearing time (FCT) associated with disorders of the maximum available current for each location system. Commercial industry began to perform arc flash labeling procedures and begin to recognize the arc flash prevention as part of the safety program, the current calculation method makes it possible to calculate the incident energy (cal / cm²) associated with the maximum three-phase disorder. Most errors are the current magnitude less than the maximum amount of three-phase current. In this final project will be discussed energy calculations, how to reduce energy, protection boundary, the selection of personal protective equipment (PPE) when the arc flash on the electrical system PT. Linde Indonesia analyzes were performed in medium voltage.

Item Type: Thesis (Undergraduate)
Additional Information: RSE 621.319 1 Nur a
Uncontrolled Keywords: Fault clearing time, Incident Energy dan Resetting Rele
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK201 Electric Power Transmission
Divisions: Faculty of Industrial Technology > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: Users 13 not found.
Date Deposited: 30 Jan 2017 03:11
Last Modified: 27 Dec 2018 03:15
URI: http://repository.its.ac.id/id/eprint/3908

Actions (login required)

View Item View Item