Perencanaan Embung Ohoi Marvun Kecamatan Kei Kecil Timur Kabupaten Maluku Tenggara

Misdanik, Anna Amalia (2017) Perencanaan Embung Ohoi Marvun Kecamatan Kei Kecil Timur Kabupaten Maluku Tenggara. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3113100066-Undergraduate_Theses.pdf]
Preview
Text
3113100066-Undergraduate_Theses.pdf - Published Version

Download (6MB) | Preview

Abstract

Desa Marvun merupakan salah satu desa yang terdapat di Kecamatan Kei Kecil Timur, Kabupaten Maluku Tenggara. Daerah tersebut dengan kondisi topografi berbukit di beberapa kawasan sering mengalami kekeringan khususnya pada musim kemarau. Pada Desa Marvun terdapat sebuah sungai yaitu Sungai Marvun yang berpotensi sebagai sumber daya air untuk memenuhi kebutuhan air penduduk sekitar. Oleh karena itu, di daerah ini perlu direncanakan suatu bangunan penampung air sebagai upaya peningkatan penyediaan air baku untuk kebutuhan air bersih maupun kebutuhan air irigasi.
Dalam Tugas Akhir ini, direncanakan Embung Ohoi Marvun dengan kedudukan as bendung yang telah ditentukan pada analisa sebelumnya. Perencanaan dilakukan dengan menganalisa data-data yang ada sehingga mendapatkan desain Embung Marvun. Analisa yang dilakukan meliputi analisa hidrologi, analisa hidrolika, serta kontrol stabilitas seluruh bangunan pada Embung Ohoi Marvun. Perhitungan yang dipakai dalam perencanaan yaitu meliputi perhitungan curah hujan rencana dengan menggunakan Log Pearson Tipe III, analisa ketersediaan debit menggunakan metode FJ. Mock, debit rencana menggunakan metode hidrograf Nakayasu, analisa tampungan menggunakan lengkung kapasitas waduk, sedangkan untuk penelusuran banjir menggunakan metode tahap demi tahap (step by step) dengan menggunakan microsoft excel, analisa tubuh embung dan kestabilannya, serta analisa pelimpah dan kestabilannya menggunakan software GeoStudio Slope/W 2012.
Dari perhitungan yang telah dilakukan diperoleh Ketersediaan air pada Sungai Marvun dengan debit andalan rerata terjadi debit maksimum pada bulan Desember sebesar 0,042 m3/detik dan terjadi debit minimum pada bulan Oktober sebesar 0,001 m3/detik. Kebutuhan air baku penduduk Desa Marvun sebesar 0,25 liter/detik. Kesetimbangan air yang terjadi pada Sungai Marvun dengan menggunakan debit andalan rerata FJ. Mock dapat memenuhi kebutuhan air irigasi dengan pola tanam palawija-palawija-palawija untuk luas lahan 5 ha. Desain Embung menggunakan tipe urugan inti tegak dengan lebar pucak 6 m, tinggi tubuh embung 10 m, lebar dasar embung 59 m, kemiringan lereng hulu 1:2,5 dan kemiringan lereng hilir 1:2. Pelimpah menggunakan tipe Ogee dengan lebar saluran pelimpah 4 m, panjang saluran peluncur 7 m, panjang kolam olak 5 m dengan tipe kolam olak yaitu USBR tipe III.
==================================================================================================================
Marvun village is one of the villages located in the Eastern District of Kei Kecil, Southeast Maluku. It has hilly topography and in some areas frequently affected, by drought, especially, in the dry season. There is Marvun River which has potential as water resources for the needs of the villagers in Marvun Village. Therefore, in those areas are necessary to design a reservoir to increase the supply of raw water for the needs of clean water and irrigation.
In this final project, designed Retention Basin of Ohoi Marvun with top notch weir, as specified in the previous analysis. Calculation is done by analyzing the data, which is already provided, to get final design of retention basin of Ohoi Marvun. Analysis was conducted on the analysis of hydrology and hydraulics, and control stability of the entire building on Retention basin of Ohoi Marvun. The calculation of rainfall design used Log Peasrson Type III, analysis of water availability used FJ. Mock Method, discharge design used Nakayasu Hidrograph, reservoir analysis used “lengkung kapasitas” method and flood routing analysis used step by step method on microsoft excel, the stability of main dam and spillway used GeoStudio Slope/W 2012 software.
From the calculation that have been done, the availability of water in the Mrvun River with the average mainstay discharge occurred in December of 0.042 m3/sec and there was a minimum discharge in October of 0.001 m3/sec. The raw water demand of Marvun Village was 0,25 liters/sec. From water balance occurred in Marvun River using mainstay discharge of average FJ. Mock can meet the needs of irrigation water with the cropping pola of palawija-palawija-palawija for a land area of 5 ha. The design of main dam used upright core type with 6 m width, 10 m of the body height, 59 m of the basic embankment width, the slope of upstream was 1:2.5 and the slope of downstream was 1:2. Spillway used Ogee type with 4 m of the channel width, 7 m of the channel launcher length, 5 m of the olak pool length with olak pool type used USBR type III.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Sungai Marvun, kekeringan, desain Embung Ohoi Marvun (Marvun River, Draught, Ohoi Marvun Retention Basin Design)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Anna Amalia Misdanik
Date Deposited: 27 Apr 2017 02:10
Last Modified: 05 Mar 2019 01:42
URI: http://repository.its.ac.id/id/eprint/41208