Dewasa ini pengembangan kapasitas energi listrik dibutuhkan untuk dapat memenuhi pertumbuhan beban dan kebutuhan listrik secara nasional. Pengembangan kapasitas tenaga listrik tersebut dilakukan dengan merencanakan penambahan pembangkit listrik sebesar 35.000 MW yang direncanakan akan selesai pada tahun 2019. Pada tahap penyelesaiannya diperlukan solusi jangka pendek untuk mengatasi kekurangan kebutuhan listrik nasional, hal tersebut dapat dilakukan dengan menggunakan Floating Power Plant. Pembangkit Listrik mengapung atau Floating Power Plant merupakan sebuah kapal, yang di buat menjadi wadah dari sistem pembangkit listrik. Keunggulan dari sistem ini adalah proses pembangunan yang relatif cepat dan pembangkit ini dapat dipindahkan sesuai dengan kebutuhan. Dengan melakukan proses kalkulasi, desain dan perencanaan, Floating Power Plant 60 MW ini dirancang menggunakan Gas Turbine yang dapat menggunakan dua buah jenis bahan bakar yaitu Diesel Oil dan Natural gas. Pada sistem bahan bakar Diesel Oil bahan bakar yang diperlukan oleh turbin ini sebesar 5.581 Ton, dengan kapasitas bahan bakar tersebut turbin ini dapat beroperasi selama 14 hari. Pada sistem Bahan bakar Natural Gas sistem ini dirancang mendapatkan suplai bahan bakar dari barge FSRU. Dalam pengerjaan Conceptual Design ini Rules dan Project Guide di gunakan sebagai dasar pemikiran untuk mendapatkan rancangan yang efisien.

====================================================================

These days
the development of electrical e
nergy capacity is needed to fullfil
national
load growth a
nd
national
electricity demand
th
at keep rising year to year
.
Electricity demand problems considered to be one of the problem hence, The
government planned to implies a d
evelopment of electr
ic power capacity and will
be planned to make
35,000 MW power plant, the power plant is planned
to
be
completed in 2019
.
It is believed that by using Floating Power Plant as a short
-
term
solution can fullfil at least few proportion of electricity demand
.
Pembangkit Listrik
mengapung
or
Floating Power Plant
is a ship
,
w
hich are made into
a
vessel
of
powe
r generation systems
.
The a
dvantage of this system is
the developm
ent process
relatively fast and the plant can be moved as needed
.
The summary of Floating
Power Plant yielded by performing several steps of calculation, design,
arrangement and
planing
. The
summary of 60MW Floating power Plant
is designed
using Gas Turbine which can use two types of
different fuel those are
Diesel Oil
and Natural gas
. In the Diesel Oil fuel
system the fuel required by the
turbine is
5,581 Ton
and it is equal with 14 days of
operation
.
T
he s
ystem of Natural Gas
is
d
esigned that
fuel
is supplied
from barge FSRU
.
Several standard are implied in
the process
of this
Conceptual
Design
.
Rules
and
Project
Guide
used as a reason
due to
efficent planing
.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Desain Konseptual, Floating Power Plant, Gas Turbine
Subjects: V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering > VM293 Shipping--Indonesia--Safety measures
Divisions: Faculty of Marine Technology (MARTECH) > Marine Engineering > 36202-(S1) Undergraduate Thesis
Depositing User: Randy Adiputra .
Date Deposited: 19 Jan 2018 06:26
Last Modified: 06 Mar 2019 07:11
URI: http://repository.its.ac.id/id/eprint/44825

Actions (login required)

View Item View Item