Santoso, Achmad Setyo (2017) Penentuan Kebijakan Pengendalian Persediaan Spare Part Pada Mesin Pulverizer (Studi Kasus: PLTU PT Ipmomi Paiton). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
2513100125-Ungraduate_Theses.pdf - Published Version Download (1MB) | Preview |
Abstract
PT International Power Mitsui Operation and Maintenance Indonesia (PT IPMOMI) merupakan salah sebuah perusahaan yang bergerak dalam bidang energi listrik yang bekerjasama dengan PAITON Energy. Dalam melakukan proses produksi PT IPMOMI memiliki mesin yang berfungsi untuk menggiling batubara yaitu pulverizer. Pada kondisi saat ini dari 25 spare part yang dimiliki oleh mesin pulverizer, hanya 6 (enam) spare part yang tidak pernah mengalami stockout. Oleh karena itu diperlukan suatu kebijakan yang dapat merancang sistem persediaan yang ada. Dengan konsep simulasi Monte Carlo dapat disimulasikan tingkat persediaan di gudang berdasarkan parameter tertentu, dan dapat dilihat dari aspek-aspek biaya seperti holding cost, ordering cost, dan stockout cost. Lalu untuk metode base-stock periodic review dapat ditentukan kombinasi untuk parameter minimum stock (s) dan maximum stock (S) untuk mendapat hasil dengan total biaya yang lebih kecil dan service level yang lebih besar dari sebelumnya. Spare part diklasifikasikan berdasarkan tingkat kritikalnya dan dengan hasil analisa dari simulasi dapat diperoleh informasi penentuan kebijakan persediaan untuk mengatasi masalah stockout pada spare part. Setelah dilakukan perhitungan antara kondisi eksisting dan hasil simulasi yang didapatkan dari metode periodic review didapatkan peningkatan rata-rata service level sebesar 11% dan pengurangan rata-rata total cost sebesar $282,41/bulan.
=================================================================
PT International Power Mitsui Operation and Maintenance Indonesia (PT IPMOMI) is one of the companies engaged in electrical energy in cooperation with PAITON Energy. In the production process PT IPMOMI has a machine that serves to grind pulverizer coal. Under the current conditions of 25 parts owned by the pulverizer engine, only 6 (six) spare parts are never stockout. Therefore, a policy is required that can design the existing inventory system. With the concept of Monte Carlo simulation can be simulated inventory level in warehouse based on certain parameters, and can be seen from cost aspect such as holding cost, ordering cost, and stockout cost. Then for method base-stock periodic review can be determined combination of reorder point (s) parameters and maximum stock (S) to get result with total cost smaller and level of service bigger than before. Spare parts are classified according to their critical level and with the results of analysis from the simulation can be obtained information determination of inventory policy to overcome stockout problem on spare part. After calculation between existing condition and simulation got increase average of service level 11% and reduce average total cost of $282,41/month.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Pengendalian persediaan spare part, periodic review, (R,s,S) system, Simulasi Monte Carlo, Total biaya persediaan |
Subjects: | T Technology > T Technology (General) > T58.62 Decision support systems T Technology > TS Manufactures > TS167 Costs, Industrial |
Divisions: | Faculty of Industrial Technology > Industrial Engineering > 26201-(S1) Undergraduate Thesis |
Depositing User: | Achmad Setyo Santoso |
Date Deposited: | 15 Nov 2017 03:25 |
Last Modified: | 08 Mar 2019 03:42 |
URI: | http://repository.its.ac.id/id/eprint/45313 |
Actions (login required)
View Item |