Ernanda, Randhi Abdillah (2017) Selisih Biaya dan Waktu Operasional Stockyard Girder Sebelum dan Sesudah Menggunakan Portal Crane pada Proyek Tol Sumo Zona 3 Seksi 1b. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
3116040528-Undergraduate_thesis.pdf - Published Version Download (6MB) | Preview |
Abstract
Pemasangan girder merupakan salah satu item pekerjaan untuk memasang girder pada pier atau abutmen. Pada proyek tol sumo zona 3 seksi 1B ini terdapat jembatan yang melewati Sungai Kali Mas Surabaya yang menggunakan struktur girder precast. Sehingga ada pekerjaan Pemasangan Girder untuk meletakan girder dengan menggunakan Launcher. Dalam metode pelaksanaan Pemasangan Girder dibutuhkan Jack Hydraulic untuk mengangkat girder agar dapat dipindahkan ke Trolley. Jack Hydraulic memiliki produktvitas yang rendah karena adanya maksimal tinggi angkat dari Jack Hydraulic sehingga memperlama durasi dalam Pemasangan Girder. Sehingga dalam tugas akhir ini ada pergantian metode dalam pengangkatan girder yang sebelumnya menggunakan Jack Hydraulic diganti dengan menggunakan Portal Crane.
Dalam Tugas Akhir ini bertujuan untuk mengetahui selisih biaya dan waktu operasional setelah metode pengangkatan diganti menggunakan Portal Crane. Pada tahap awal tugas akhir ini adalah menentukan urutan pekerjaan setelah ada pergantian metode pengangkatan dalam pekerjaan Pemasngan Girder. Setelah itu menghitung produktivitas dari Portal Crane itu sendiri untuk mengetahui durasi pengangkatan agar dapat disingkronkan dengan item pekerjaan lain untuk menghasilkan harmonisasi dari masing-masing item pekerjaan. Dan diakhir tugas akhir ini akan dihitung perbedaan biaya dan waktu setelah penggantian metode pengangkatan girder.
Hasil dari Tugas Akhir ini menunjukan dengan mengganti metode pengangkatan yang sebelumnya menggunakan Jack Hydraulic menjadi Portal Crane terdapat perbedaan biaya dan waktu dalam pekerjaan Pemasangan Girder. Dalam segi biaya dengan menggunakan Portal Crane biaya operasional menjadi lebih mahal akibat penyewaan Portal Crane yang mahal. Dan dalam segi waktu pelaksanaan menggunakan Portal Crane lebih cepat karena produktivitas Portal Crane lebih besar dari pada Jack Hydraulic.
==========================================================================================
Girder Erection is one of the items in girder installation on pier or abutment. On this project, there is a bridge that passes Kali Mas River in Surabaya which uses a structure of precast girder. Therefore, a Girder Erection installation is done using the Girder Launcher. In this method of Girder Erection implementation, it is required to use Jack Hydraulic to lift up the girder in order to be transferred to the trolley. Jack Hydraulic has a low productivity due to the maximum lift height on the Jack Hydraulic. Hence, it will take more time for Girder Erection to do the work. Due to this particular issue, this final project came up to help maximize the process by replacing the method of girder lifting process which was previously done by Jack Hidraulic and it will be replaced by using the Portal Crane.
This final project is aimed to define the difference of operational cost and time using Portal Crane. In early stages, the first step is to determine order of work after replacing the method of lifting in Girder Erection. The next step is to calculate the productivity of Portal Crane itself to determine the lifting duration so as to be synchronized with other work items to generate harmonization of each work item. And in the last step, the difference of cost and time will be calculated after replacing method of girder lifting.
The result of this final project proves that by replacing the previous lifting method using a Jack Hydraulic to a Portal Crane. There are differences in terms of cost and time in Girder Erection. In terms of cost of using Portal Crane, the operational costs are more expensive due to the rental cost of Portal Crane. And in the time implementation of using Portal Crane is faster because the productivity of using Portal Crane is faster than using Jack Hydraulic.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Girder erection, jack hydraulic, portal crane |
Subjects: | T Technology > T Technology (General) > T56.8 Project Management T Technology > TG Bridge engineering |
Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D3) |
Depositing User: | Randhi Abdillah Ernanda |
Date Deposited: | 10 Oct 2017 03:24 |
Last Modified: | 08 Mar 2019 03:21 |
URI: | http://repository.its.ac.id/id/eprint/45441 |