Septiwianto, Alief (2017) Penjadwalan Multi Produk pada Mesin Paralel Filling Lithos di PT Pertamina Lubricants Plant Unit Gresik. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
2513100084-Undergraduate_Thesis.pdf - Published Version Download (5MB) | Preview |
Abstract
Pertamina Lubricants Plant Unit Gresik memproduksi pelumas dalam kemasan drum, lithos, dan curah. Saat ini penjadwalan operasi pada mesin paralel filling lithos belum mempertimbangkan waktu setup yang mengurangi ketersedian waktu produksi. Waktu setup memiliki nilai parameter yang berbeda tergantung dari pergantian antar produk. Jadwal operasi pada mesin paralel filling lithos yang memaksimumkan keuntungan yang didapatkan dengan mengembangkan suatu model Integer Linear Programming. Model diselesaikan dengan Teknik Branch and Bound sehingga dapat menghasilkan solusi yang optimal. Namun demikian untuk menyelesaikan permasalahan riil dibutuhkan iterasi yang sangat panjang dan waktu komputasi yang sangat lama. Oleh sebab itu perlu ditetapkan jumlah iterasi untuk membatasi waktu komputasi namun masih menghasilkan solusi yang cukup baik. Model juga dapat digunakan untuk membuat jadwal operasi baru apabila terjadi kerusakan mesin atau material tidak tersedia pada saat menjalankan jadwal operasi yang sudah dibuat sebelumnya.
==================================================================
PT Pertamina Lubricants Plant Unit Gresik produces lubricant in drum, lithos, and bulk form. Currently, the operation scheduling in parallel filling lithos machine doesn't consider setup time that reduces the availability of production time. Setup time has different parameter value depending on the interchange between product. Operation schedule in parallel filling lithos machine that will maximize profit can be generated through developing an Integer Linear Programming model. Model will be solved using Branch and Bound method so it can produce optimum solution. To solve real problems, this method will take a very long iteration and computation. Therefore, the number of iteration has to be set to bound the computation time yet still producing pretty good solution. Model also can be made to create the new operation schedule if there's a machine breakdown or unavaliability of material supply in doing the operation schedule that has been made before.
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | RSI 658.53 Sep p |
Uncontrolled Keywords: | Jadwal Operasi, Paralel Mesin, Optimasi, Integer Linier Programming, Waktu Setup |
Subjects: | T Technology > T Technology (General) > T58.62 Decision support systems |
Divisions: | Faculty of Industrial Technology > Industrial Engineering > 26201-(S1) Undergraduate Thesis |
Depositing User: | Alief Septiwianto |
Date Deposited: | 22 Nov 2017 07:45 |
Last Modified: | 08 Mar 2019 01:47 |
URI: | http://repository.its.ac.id/id/eprint/46364 |
Actions (login required)
View Item |