Redesain Overhead Crane dengan Analisa Kegagalan di PLTU Paiton Berbasis Metode Elemen Hingga

Sahadewa, Alfian Aziz (2017) Redesain Overhead Crane dengan Analisa Kegagalan di PLTU Paiton Berbasis Metode Elemen Hingga. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2113106026-Undergraduate_Theses.pdf] Text
2113106026-Undergraduate_Theses.pdf
Restricted to Repository staff only

Download (2MB) | Request a copy

Abstract

Crane adalah alat bantu yang digunakan untuk mempermudah dalam memindahkan suatu obyek atau barang dengan ukuran yang relatif besar dan berat dari satu posisi ke posisi lainnya. Pada PLTU PAITON alat bantu crane digunakan untuk proses maintenace mesin grinding mill.
Penggunaan alat bantu Crane tak lantas memudahkan proses maintenance karena Hoist Grider Crane Mill terkendala ruang gerak yang terbatas. terbatasnya ruang gerak menyebabkan tidak sejajarnya sumbu antara kawat penarik dengan sepesial tool yang menyebabkan beban pengangkatan menjadi 2x dari beban awal. Akibat tidak sejajarnya kawat overhead crane menakibatkan terjadinya patahan pada housing motor crane yang bertugas untuk menggerakan grider kearah vertikal Oleh karena itu perlu adanya modifikasi overhead girder dengan menggunakan perangkat lunak SolidWorks.
Hasil yang diperoleh dari penelitian ini yaitu berdasarkan hasil pengujian, stress, displacement, dan angka keamanan modifikasi 1 memiliki hasil simulasi yang hampir sama dengan hasil dari simulasi awal dengan nilai stress sebesar 36,19 Mpa, Displacement sebear 0,98 mm, dan angka keamanan sebesar 5,7. Pada modifikasi 2 perbedaan hasil simulasi yang paling besar terletak pada simulasi tegangan (stress) sebesar 158,3 Mpa. sedangkan hasil simulasi defleksi dan angka keamanan tidak berbeda jauh dengan simulai awal dimana defleksi sebesar 0,93 dan angka keamanan sebesar 3,1.
============================================================================================
Crane is a tool used to facilitate moving an object with a relatively large size and weight from one position to another position . At PLTU paiton crane used to process maintenace grinding mill machine.
The use of crane is not thus simplify the process maintenance because the Hoist Grider Cranes Mill constrained space is limited. the limited space causes no parallel axis between the towing wire with the sepesial tool that is causing the burden of adoption into the initial load of 2 x. Due to the overhead crane wire sejajarnya not caused the occurrence of the fault on the motor housing to drive the crane grider towards vertical and therefore the need for modifications to the overhead girder using SolidWorks software.
The results obtained from this research that is based on the test results, stress, displacement, and numbers of security modifications 1 has almost the same simulation results with the results of the initial value of the simulation of the stress of Displacement sebear 36.19 0.98 Mpa, mm, and the security of 5.7. On difference 2 modification results of simulation lies in voltage simulation (stress) of 158.3 Mpa. While the results of the simulation of deflection and security figures did not vary much with early simulai where deflection of 0.93 and security figures amounted to 3.1.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Elemen hingga (Finite elemen analysis), Crane, Teori kegagalan, SolidWork, Simulasi, Failure theory
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA347 Finite Element Method
T Technology > TA Engineering (General). Civil engineering (General) > TA645 Structural analysis (Engineering)
Divisions: Faculty of Industrial Technology > Mechanical Engineering > 21201-(S1) Undergraduate Thesis
Depositing User: Sahadewa Alfian Aziz
Date Deposited: 23 Oct 2017 08:23
Last Modified: 09 Jan 2018 07:02
URI: http://repository.its.ac.id/id/eprint/46806

Actions (login required)

View Item View Item