Model Penilaian Kontraktor Pada Proyek Ketenagalistrikan Menggunakan Metode AHP dan Fuzzy TOPSIS

Kusuma, Dodi Angga (2017) Model Penilaian Kontraktor Pada Proyek Ketenagalistrikan Menggunakan Metode AHP dan Fuzzy TOPSIS. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 9113202817-Master_Theses.pdf]
Preview
Text
9113202817-Master_Theses.pdf - Published Version

Download (2MB) | Preview

Abstract

Pengadaan barang/jasa menduduki posisi yang sangat penting dalam suatu organisasi, karena merupakan sarana penggunaan anggaran dalam jumlah signifikan guna mendapatkan barang, jasa, dan pekerjaan yang dibutuhkan bagi pelaksanaan misi organisasi. Keputusan memilih penyedia barang/jasa harus didukung oleh pertimbangan yang objektif dan menguntungkan dalam pencapaian waktu, biaya dan kualitas.
Analisa dilakukan kepada pemilik proyek sebagai pengguna jasa kontraktor sehingga didapatkan hasil kontraktor terbaik pada proyek tersebut. Metode penilaian kontraktor yang digunakan sebagai alat analisa adalah dengan metode AHP (Analytical Hierarcy Process) dan Fuzzy TOPSIS .
Hasil akhir metode pemilihan kontraktor yang digunakan sebagai alat analisa metode AHP (Analytical Hierarcy Process) dan Fuzzy TOPSIS dengan menggunakan 3 (tiga) kriteria utama yaitu : Administrasi, Teknis, Harga serta 10 (sepuluh) sub kriteria. Hasil penilaian yang dilakukan menunjukan kontraktor PT CA dengan nilai 0.723 merupakan kontraktor terbaik.
===================================================================================================
Procurement occupies a very important position in an organization, because it is a means of using a significant amount of budget in order to obtain goods, services, and work required for the implementation of the mission of the organization. The decision to choose the provider should be supported by objective and profitable considerations in the achievement of time, cost and quality.
The analysis is carried out to the project owner as a contractor user so that the best contractor's results are obtained on the project. Contractor valuation method used as a tool of analysis is by AHP (Analytical Hierarcy Process) and Fuzzy TOPSIS method.
The final result of the contractor selection method is used as analytical hierarchy process and Fuzzy TOPSIS tool using 3 (three) main criteria: Administration, Technical, Price and 10 (ten) sub criteria. The results of the assessment show that PT CA contractor with a value of 0.723 is the best contractor.

Item Type: Thesis (Masters)
Additional Information: RTMT 658.403 801 1 Kus m-1
Uncontrolled Keywords: Procurement, Electricity Project, AHP, and Fuzzy TOPSIS
Subjects: T Technology > T Technology (General) > T56.8 Project Management
T Technology > T Technology (General) > T58.62 Decision support systems
Divisions: 61101-Magister Management Technology
Depositing User: Dodi Angga Kusuma
Date Deposited: 15 Jan 2018 08:11
Last Modified: 05 Mar 2019 03:49
URI: http://repository.its.ac.id/id/eprint/48231

Actions (login required)

View Item View Item