Perancangan Business Continuity Plan Untuk Teknologi Informasi Pada Studi Kasus Stie Perbanas

Putri, Sabrina Leviana (2016) Perancangan Business Continuity Plan Untuk Teknologi Informasi Pada Studi Kasus Stie Perbanas. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 5212100050-Undergraduate Thesis.pdf]
Preview
Text
5212100050-Undergraduate Thesis.pdf

Download (2MB) | Preview

Abstract

Studi kasus pada penelitian ini adalah STIE (Sekolah Tinggi
Ilmu Ekonomi) Perbanas yang merupakan suatu perguruan tinggi
dan bergerak di bidang pendidikan. STIE Perbanas menggunakan
teknologi informasi untuk mendukung jalannya operasional proses
bisnis dan untuk dapat mendukung layanan teknologi informasi
yang dimilikinya. Untuk dapat menjaga keberlangsungan bisnis
pada suatu organisasi, dibutuhkan sebuah perencanaan yang
dapat mengidentifikasikan risiko terjadinya bencana kemudian
memberikan prosedur dan strategi untuk dapat mengurangi atau
meminimalisir risiko tersebut. Perencanaan inilah yang disebut
dengan Business Continuity Plan (BCP). Dokumen BCP
diharapkan dapat membantu STIE Perbanas untuk mengambil
tindakan saat terjadi ancaman dan bencana.
Metode yang dilakukan dalam penelitian ini adalah
melakukan formulasi kerangka kerja BCP dan melakukan analisis
risiko serta analisis dampak bisnis. Formulasi kerangka kerja BCP
dilakukan dengan melihat kebutuhan dan keinginan organisasi
mengenai keberlangsungan bisnis dan menyeseuaikannya dengan
standar kerangka kerja BCP yang digunakan sebagai acuan, yaitu
ISO 22301:2012 dan Kerangka Kerja BCM Griffith University.
Rancangan dokumen BCP dihasilkan dengan meninjau hasil
penilaian risiko dan penilaian dampak bisnis yang disesuaikan
dengan hasil formulasi kerangka kerja BCP. Sehingga nantinya
didapatkan dokumen BCP yang sesuai dengan kebutuhan dan
keinginan organisasi. Hasil dokumen BCP yang telah sesuai
tersebut kemudian akan diverifikasi dan divalidasi oleh organisasi.
===============================================================================================
The case studies in this research is STIE (Sekolah Tinggi Ilmu
Ekonomi) Perbanas which is a college that engaged in education
field. STIE Perbanas use information technology (IT) to support
their business processes and operational activities also to support
their information technology services. To be able to maintain
business continuity, organization need a plan that would identify
risks to the disaster then provide procedures and stra tegies to
reduce or minimize risk. This plan is called the Business Continuity
Plan (BCP). BCP document is expected to help STIE Perbanas to
take action in the event of threats and disasters.
The method used in this research is to conduct BCP
framework formulation and perform risk analysis and business
impact analysis. BCP framework formulation is done by identify
the needs and desires of the organization's business continuity and
adjust it with BCP standard framework that is used as a reference,
ISO 22301: 2012 and BCM Framework Griffith University. From
the results of the formulations organization will have BCP
framework that suitable to the needs of the organization.
BCP document produced by reviewing the results of the risk
assessment and business impact assessments that were adjusted to
the results of BCP formulation framework. So later, organization
viii
will be able to have a BCP document that suitable with the needs
and desires of the organization. Result of BCP document that are
compliant will then be verified and validated by the organization.
The case studies in this research is STIE (Sekolah Tinggi Ilmu
Ekonomi) Perbanas which is a college that engaged in education
field. STIE Perbanas use information technology (IT) to support
their business processes and operational activities also to support
their information technology services. To be able to maintain
business continuity, organization need a plan that would identify
risks to the disaster then provide procedures and stra tegies to
reduce or minimize risk. This plan is called the Business Continuity
Plan (BCP). BCP document is expected to help STIE Perbanas to
take action in the event of threats and disasters.
The method used in this research is to conduct BCP
framework formulation and perform risk analysis and business
impact analysis. BCP framework formulation is done by identify
the needs and desires of the organization's business continuity and
adjust it with BCP standard framework that is used as a reference,
ISO 22301: 2012 and BCM Framework Griffith University. From
the results of the formulations organization will have BCP
framework that suitable to the needs of the organization.
BCP document produced by reviewing the results of the risk
assessment and business impact assessments that were adjusted to
the results of BCP formulation framework. So later, organization
viii
will be able to have a BCP document that suitable with the needs
and desires of the organization. Result of BCP document that are
compliant will then be verified and validated by the organization.

Item Type: Thesis (Undergraduate)
Additional Information: RSSI 658.403 801 1 Put p
Uncontrolled Keywords: Business Continuity Plan, Griffith University, ISO 22301:2012, Manajemen Risiko, Risiko, Teknologi Informasi.
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD30.213 Management information systems. Dashboards. Enterprise resource planning.
H Social Sciences > HD Industries. Land use. Labor > HD30.28 Planning. Business planning. Strategic planning.
Divisions: Faculty of Information Technology > Information System > 57201-(S1) Undergraduate Thesis
Depositing User: Mr. Tondo Indra Nyata
Date Deposited: 09 Oct 2017 04:53
Last Modified: 27 Dec 2018 04:27
URI: http://repository.its.ac.id/id/eprint/48934

Actions (login required)

View Item View Item