Studi Kelayakan Pembangunan Jalan Tol Ciawi - Sukabumi Ditinjau dari Aspek Ekonomi dan Finansial

Munawar, Galih Gardian (2018) Studi Kelayakan Pembangunan Jalan Tol Ciawi - Sukabumi Ditinjau dari Aspek Ekonomi dan Finansial. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3113100132-Undergraduate_Theses.pdf]
Preview
Text
3113100132-Undergraduate_Theses.pdf - Accepted Version

Download (3MB) | Preview

Abstract

Dalam perencanaan jalan tol Ciawi - Sukabumi diperlukan pertimbangan ekonomi dan finansial sebagai acuan dalam investasi agar jalan tol tersebut merupakan perencanaan yang efisien. Oleh karena itu perlu dilaksanakan STUDI KELAYAKAN PEMBANGUNAN JALAN TOL CIAWI – SUKABUMI DITINJAU DARI ASPEK EKONOMI DAN FINANSIAL. Dengan dilaksanakannya studi tersebut didapatkan berapa besar penghematan Biaya Operasional Kendaraan (BOK) dan nilai waktu (time value) dengan adanya jalan tol Ciawi – Sukabumi. Sehingga akan diketahui kelayakan jalan tol Ciawi – Sukabumi dari segi analisis ekonomi dan finansial.
Metodologi untuk menganalisis Biaya Operasional Kendaraan (BOK) dan nilai waktu (time value) menggunakan metode Jasa Marga. Untuk menganalisis aspek kelayakan ekonomi menggunakan parameter BCR dan NPV sebagai acuan kelayakan. Sedangkan untuk menganalisis aspek kelayakan finansial menggunakan parameter BCR, NPV, dan IRR sebagai acuan kelayakan.
Dari analisis aspek ekonomi didapatkan penghematan BOK dan nilai waktu (time value) sebesar Rp 21.719.489.776.995,20 Sehingga didapat hasil nilai BCR sebesar 3,17 > 1 dan nilai NPV sebesar Rp 14.870.796.264.847,00 > 0. Berdasarkan nilai BCR > 1 dan NPV > 0, maka dapat disimpulkan pembangunan jalan tol Ciawi – Sukabumi layak dari aspek ekonomi. Dari analisis aspek finansial, didapatkan nilai keuntungan sebesar Rp 22.339.005.821,645,70. Sehingga didapat hasil nilai BCR sebesar 3,26 > 1, nilai NPV sebesar Rp 15.490.312.309.527,20 > 0, dan nilai IRR sebesar 14,88 % < 7,25 % (MARR). Berdasarkan nilai BCR > 1, NPV > 0, dan IRR < MARR maka dapat disimpulkan pembangunan jalan tol Ciawi – Sukabumi layak dari aspek finansial.
=========================================================================================================
Highway planning in Ciawi-Sukabumi needed economic and financial considerations as a reference in the investment so that the toll road is an efficient planning. Therefore needs to be carried out the FEASIBILITY STUDY DEVELOPMENT of TOLL ROADS, CIAWI – SUKABUMI REVIEWED ECONOMIC and FINANCIAL ASPECT. With the performance of the study was obtained by how large the savings Vehicle operating costs (VOC) and the time value (time value) by the presence of Ciawi toll road – Sukabumi. So it will be known to the feasibility of toll roads, Ciawi – Sukabumi in terms of economic and financial analysis.
A methodology for analyzing Vehicle operating costs (VOC) and the time value (time value) using the method of Jasa Marga. To analyze economic feasibility aspects using the parameters of the BCR and NPV as proprietary. As for the financial aspects of analyzing the feasibility of using parameters of the BCR and NPV, IRR, as proprietary.
From the analysis of the economic aspects of the obtained savings BOK and time value (time value) of Rp 21.719.489.776.995,20 so that obtained results value of BCR 3,17 > 1 and the value of NPV is Rp 14.870.796.264.847,00 > 0. Based on the value of BCR > 1 and NPV > 0, then it can be concluded the construction of toll roads, Ciawi – economic aspects worthy of Sukabumi.From the analysis of the financial aspects, obtained a value of profit amounting to Rp 22.339.005.821,645,70. So the obtained results the value of BCR 3,26 > 1, the value of NPV is Rp 15.490.312.309.527,20 > 0, and the value of the IRR of 14.88% > 7.25% (MARR) Based on the value of BCR > 1, NPV > 0, then it can be inferred IRR< MARR toll road development Ciawi – Sukabumi worthy financial aspects

Item Type: Thesis (Undergraduate)
Additional Information: RSS 625.7 Mun s-1 3100018074461
Uncontrolled Keywords: Analisis kelayakan, Ekonomi, Finansial, Travel time, BOK, Feasibility analysis, Economic, Vehicle operational cost
Subjects: T Technology > TE Highway engineering. Roads and pavements
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Galih Gardian Munawar
Date Deposited: 09 Feb 2018 03:36
Last Modified: 30 Mar 2020 05:46
URI: http://repository.its.ac.id/id/eprint/50393

Actions (login required)

View Item View Item