Analisis Risiko Sistem TEG Contactor Dengan Metode Risk-Based Inspection (RBI) Semi-Kuantitatif Dan Bahaya Dengan Metode Hazard And Operability Study (HAZOPS)

Kewasi, Vigita Maria Cecilia (2018) Analisis Risiko Sistem TEG Contactor Dengan Metode Risk-Based Inspection (RBI) Semi-Kuantitatif Dan Bahaya Dengan Metode Hazard And Operability Study (HAZOPS). Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 02511440000140-Undergraduate_Theses.pdf]
Preview
Text
02511440000140-Undergraduate_Theses.pdf - Accepted Version

Download (5MB) | Preview

Abstract

Dalam instalasi komponen di industri minyak dan gas, penilaian risiko dan bahaya diperlukan untuk mengantisipasi potensi kegagalan pada sistem produksi yang dapat menyebabkan kerugian perusahaan. Risk-Based Inspection (RBI) dan Hazard Operability Study (HAZOPS) merupakan jenis assessment yang umum digunakan oleh perusahaan migas. Tujuan studi penelitian ini adalah untuk menganalisis tingkat risiko dengan RBI semi-kuantitatif berdasarkan API RP 581 dan tingkat bahaya dengan HAZOPS berdasarkan BS IEC 61882 pada TEG Contactor. Risk Based Inspection adalah pengkategorian tingkat risiko pada suatu alat produksi untuk meminimalisasi kegagalan komponen dan dampak terhadap lingkungan kerja. Sedangkan HAZOPS merupakan penilaian kategori bahaya dengan standar deviasi tertentu pada suatu komponen. TEG Contactor merupakan bejana kolom dengan yang berfungsi sebagai sistem dehidrasi wet gas. Analisis RBI dan HAZOPS dilakukan pada TEG Contactor untuk mencegah kegagalan komponen akibat fluida wet gas dan rich glycol yang mengandung H2S dan CO2 selama kondisi operasi. Pembagian area penilaian RBI dilakukan pada enam komponen, yaitu top shell TEG contactor, bottom shell TEG contactor,
pipa inlet wet gas, pipa outlet dry gas, pipa inlet lean glycol, dan pipa outlet rich glycol, sedangkan area penilaian HAZOPS terbagi menjadi dua berdasarkan fluida yang dialiri, yaitu sistem dari komponen pipa inlet wet gas menuju top shell TEG contactor dan pipa outlet dry gas serta sistem dari komponen bottom shell TEG contactor menuju pipa inlet lean glycol dan pipa outlet rich glycol. Berdasarkan kondisi operasi dan studi yang dilakukan, hasil RBI pada top shell TEG contactor, pipa inlet wet gas, dan pipa outlet dry gas yang dialiri metana memiliki tingkat risiko Medium (1D). Sedangkan komponen bottom shell TEG contactor, pipa inlet lean glycol, dan pipa outlet rich glycol memiliki tingkat risiko Medium-high (1E). Untuk hasil analisis HAZOPS, keenam komponen memiliki tingkat bahaya pada level Low. Setelah dilakukan scoring RBI dan HAZOPS, rekomendasi interval inspeksi pada keenam komponen dilakukan setiap 10 tahun dengan inspeksi visual dan UT Thickness.
=============================================================================================================
Along with the installation of components in the oil and gas industry, risk and hazard assessments are required to anticipate the potential failures of production systems that could cause corporate losses. Risk-Based Inspection (RBI) and Hazard Operability Study (HAZOPS) is a common type of assessment that have been used by oil and gas companies. The purpose of this study is to analyze the risk-level of the TEG Contactor system with semi-quantitative RBI methods based on API RP 581 and hazard risk-rating with HAZOPS based on BS IEC 61882 on TEG Contactor. Risk Based Inspection is the categorization of risk level in a system of the plant production to minimize the component failures and its effect through environment. Meanwhile, HAZOPS is a hazard category assessment with a certain standard deviation of the components. TEG Contactor is one of a pressure vessel that have been used as a dehydration system. RBI and HAZOPS methods were performed to prevent component failure of TEG Contactor due to wet gas and rich glycol fluids which contain H2S and free water during the operating conditions. The risk assessment area is divided into top shell of TEG Contactor, bottom shell of TEG Contactor, inlet wet gas pipe, dry gas outlet pipe, lean glycol inlet pipe, and rich glycol outlet pipe. While the HAZOPS assessment area is divided by its fluids, there are inlet wet gas pipe to top shell TEG contactor through outlet dry gas pipe system and bottom shell TEG contactor to pipa inlet lean glycol through pipa outlet rich glycol system. From these studies, the results of RBI analysis on TEG Contactor system found that top shell TEG Contactor, inlet wet gas pipes, and methane gas dry outlets pipe have Medium risk level (1D). Whilst, bottom shell TEG Contactor, lean glycol inlet pipe, and rich glycol outlet pipe got Medium-High risk level (1E) because TEG liquid fluid tends to be instantaneous. For the results of HAZOPS analysis, the six components is included into low-level. After these scorings, the interval of inspections of each components is about every ten years with visual inspection and UT Thickness methods.

Item Type: Thesis (Undergraduate)
Additional Information: RSMt 620.112 6 Kew a-1 3100018075870
Uncontrolled Keywords: RBI, HAZOPS, TEG Contactor, Risk Assessment, Pressure Vessel
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
T Technology > TN Mining engineering. Metallurgy > TN879.5 Petroleum pipelines
Divisions: Faculty of Industrial Technology > Material & Metallurgical Engineering > 28201-(S1) Undergraduate Thesis
Depositing User: Kewas Vigita Maria Cecilia
Date Deposited: 20 Dec 2018 06:14
Last Modified: 08 Oct 2020 06:01
URI: http://repository.its.ac.id/id/eprint/52756