Studi Kelayakan Pembangunan dan Pemasangan PLTS 1MWp Pada PT. Pertamina EP Tanjung

Nugraha, Aditya (2018) Studi Kelayakan Pembangunan dan Pemasangan PLTS 1MWp Pada PT. Pertamina EP Tanjung. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 07111440000060-Undergraduate_Theses.pdf]
Preview
Text
07111440000060-Undergraduate_Theses.pdf - Accepted Version

Download (8MB) | Preview

Abstract

PT. Pertamina EP (Eksplorasi Produksi) Tanjung ditunjuk menjadi salah satu pelaksana program energi baru terbarukan PT. Pertamina yakni melalui pemasangan sistem PLTS dengan kapasitas 1MWp. Adanya pemasangan PLTS pada sistem kelistrikan PT. Pertamina EP Tanjung maka dibutuhkan suatu studi kelayakan untuk meninjau dan menilai pembangunan dan pemasangan sistem PLTS ini. Studi kelayakan yang diberikan yakni menilai aspek lokasi dan rancang sistem PLTS, kemudian pengaruh sistem PLTS terhadap sistem kelistrikan eksisting, dan yang terakhir adalah analisa biaya. Pada aspek lokasi dan rancang sistem PLTS digunakan perangkat lunak Pvsyst untuk melakukan penilaian, kemudian untuk penilaian sistem kelistrikan dilakukan menggunakan perangkat lunak ETAP 12.6.0, dan untuk aspek analisa biaya dilakukan dengan menentukan lamanya payback return. Hasil dari tugas akhir ini memperlihatkan bahwa berdasarkan aspek lokasi dan rancang sistem PLTS, tersedia lahan yang lebih luas dan shading yang nilainya secara keseluruhan mendekati 0. Dilihat dari aspek kelistrikan, dengan adanya pemasangan sistem PLTS ini terdapat sedikit perubahan pada sistem kelistrikan eksisting, namun tidak signifikan sehingga masih bisa direspon baik oleh sistem, dan juga tidak dibutuhkan penggantian alat pada sistem eksisting. Terakhir dari segi biaya, payback return terjadi dalam periode investasi atau selama jangka waktu pembayaran kredit. Karena itu secara keseluruhan pembangunan dan pemsangan sistem PLTS 1MWp ini dapat dikatakan layak.
============================================================================================================
PT. Pertamina EP (Exploration Production) Tanjung was chosen to apllied PT. Pertamina renewable energy pogram by installing Photovoltaic (PV) system with a capacity of 1MWp. By installing PV system to PT. Pertamina EP Tanjung existing electrical system, there should be a feasibility study needed to assess and determine whether it is doable or not. The study that is about to give will evaluate 3 aspects,which are location and PV system aspect, electrical aspect, and financial aspect. Pvsyst software will be used to evaluate location and PV system. For electrical aspect, this study will use ETAP 12. 6.0 software, and for financial aspect, this study will evaluate through payback return time. The result showed that from location and Pvsystem aspect, there was a sufficient area for PV system and the shading value was almost 0 at all. From electrical side, it showed some changes to an existing system but nothing big and no equipment changes needed. Last, from financial side,the payback return happened before invest period over. Moreover, from those 3 aspects, it can be concluded that the installment of 1MWp PV system can be done and feasible.

Item Type: Thesis (Undergraduate)
Additional Information: RSS 388.413 12 Nug a 3100009036468
Uncontrolled Keywords: Photovoltaic, Kelayakan, feasibility, photovoltaic
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD30.24 Feasibility studies. Feasibility appraisals
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1010 Electric power system stability. Electric filters, Passive.
Divisions: Faculty of Electrical Technology > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: Aditya Nugraha
Date Deposited: 18 Dec 2018 02:58
Last Modified: 08 Oct 2020 04:11
URI: http://repository.its.ac.id/id/eprint/52890

Actions (login required)

View Item View Item