Aditama, Abien Pria (2018) Studi Kelayakan Pemasangan PLTS 870 Kw Pada Sistem Kelistrikan Pertamina EP Ukui-Lirik. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
07111440000120-Undergraduate_Theses.pdf - Accepted Version Download (1MB) | Preview |
Abstract
Perencanaan pemasangan Pembangkit Listrik Tenaga Surya (PLTS) sebesar 870 kW pada sistem kelistrikan Pertamina EP Ukui-Lirik memerlukan berbagai kajian. Khususnya kajian dari segi kelistrikan dan dari segi ekonomi. Dari segi kelistrikan dibutuhkan analisis aliran daya (power flow), hubung singkat (short circuit), stabilitas transien (transient stability), dan analisis koordinasi proteksi (protection coordination). Untuk melakukan analisis-analisis di atas, digunakan sebuah software penunjang yaitu Electrical Transient Analysis Program (ETAP).
Dari segi ekonomi, beberapa hal yang perlu dikaji diantaranya adalah potensi energi yang mampu dihasilkan PLTS, perhitungan biaya investasi, biaya pembangkitan energi listrik, dan biaya yang dapat dihemat Pertamina EP Ukui-Lirik setelah menggunakan PLTS.
Kedua hasil kajian ini akan digunakan sebagai penentu kelayakan pemasangan PLTS pada sistem kelistrikan Pertamina EP Ukui-Lirik.
================ Planning of solar power plant of 870 kW on Pertamina EP Ukui-Lirik electrical system requires various studies. Especially in terms of electricity and economic terms. Electrical analysis requires power flow analysis, short circuit analysis, transient stability analysis, and protection coordination analysis. To perform the above analyzes, used a supporting software that is Electrical Transient Analysis Program (ETAP).
In terms of economics, several things that need to be studied include the potential energy that can be generated by PLTS, calculation of investment costs, electricity generation costs, and costs that can be saved by Pertamina EP Ukui-Lirik after using PLTS.
Both results of this study will be used to determine the feasibility of installing PLTS on Pertamina EP Ukui-Lirik electrical system.
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | RSE 621.319 Adi s |
Uncontrolled Keywords: | PLTS, feasibility study, generation cost, studi kelayakan, biaya pembangkitan |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1322.6 Electric power-plants |
Divisions: | Faculty of Electrical Technology > Electrical Engineering > 20201-(S1) Undergraduate Thesis |
Depositing User: | Pria Aditama Abien |
Date Deposited: | 29 Nov 2018 04:21 |
Last Modified: | 23 Apr 2021 04:43 |
URI: | http://repository.its.ac.id/id/eprint/53004 |