Nobel, Muhammad Mahardika (2018) Konstruksi Diagram Ladder Menggunakan Metode Flow-Table/State Diagram untuk Crude Palm Oil Process. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
07111440000183-Undergraduate_Theses.pdf Download (8MB) | Preview |
Abstract
Dalam proses pengolahan buah sawit menjadi minyak sawit mentah (crude palm oil) terdapat lima proses umum. Yaitu sterilisasi (perebusan buah sawit), penebahan (pemisahan buah sawit dari tandan), pelumatan (pemisahan daging buah dari biji), pengepresan (pemisahan minyak dari daging buah), dan klarifikasi (pemisahan minyak, air, dan kotoran).Atas dasar tersebut maka dibutuhkan tindakan yang benar untuk setiap tahapan proses sehingga hasil akhir yang diperoleh bisa maksimal. Faktor lain yang menentukan kualitas hasil dan efisiensi dari pabrik adalah peralatan yang harus dalam kondisi standard, baik kualitas maupun kuantitasnya dari setiap alat. Kapasitas dari suatu proses dengan yang lainnya harus sinkron dan cara pengoperasian dari setiap proses juga merupakan factor yang menentukan kinerja dari suatu pabrik kelapa sawit. Proses-proses yang terjadi dalam pengolahan kelapa sawit dapat dirancang dalam bentuk konstruksi ladder diagram yang akan diaplikasikan ke PLC sebagai kontroler. Dengan adanya ladder diagram, proses yang dilakukan akan berjalan secara sekuensial. Namun, terdapat batasan jumlah relay yang dapat digunakan dalam pemrograman PLC, sehingga akan sulit diterapkan. Oleh karena itu dibutuhkan suatu cara agar dapat meminimalkan penggunaan relay, yaitu dengan menggunakan metode state diagram yang dikonstruksikan ke ladder diagram. Dengan menggunakan state diagram, hasil konstruksi ladder diagram diperoleh sebanyak 96 rung, 916 buah kontak relay, dan kapasitas program yang dihasilkan sebesar 18KB.
==================================================================================
In processing palm oil into crude palm oil (cpo), there are five general process. Sterilization of palm fruits, separation of palm fruit from bunch, separation of pericarp fruit from seed, pressing fruit, and clarification (oil, water, and dirt separation). So in this process, the right action is required for each stage of the process so the final result can be maximized. Another factor that can determines the quality and efficiency of the plant is the equipment must be in standard condition, both quality and quantity of each tool. The capacity of a process with each other must be synchronous and the mode of operation of each process is also a factor that determines the performance of a palm oil mill. Processes that occur in palm il processing can be designed in the form of a ladder diagram construction that will be applied to the PLC as a controller. With the ladder diagram, the process will run sequentially. However, there is a limit to the number of relays that can be use in PLC programming, so it will be difficult to implement. Therefore, we need a way to minimize the use of relay by using state diagram method which is constructed to the ladder diagram. By using state diagram method, the result of ladder diagram construction is obtained by 96 rung, 916 contact relay, and the program capacity is 18 KB.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Crude Palm Oil Process, Flow-Table/State Diagram, Ladder Diagram, PLC, Rung. |
Subjects: | T Technology > T Technology (General) T Technology > TS Manufactures |
Divisions: | Faculty of Electrical Technology > Electrical Engineering > 20201-(S1) Undergraduate Thesis |
Depositing User: | Nobel Muhammad Mahardika |
Date Deposited: | 11 Feb 2019 03:09 |
Last Modified: | 11 Feb 2019 03:09 |
URI: | http://repository.its.ac.id/id/eprint/53183 |
Actions (login required)
View Item |