Perencanaan Ulang Struktur Hotel 12 Lantai di Malang Menggunakan Sistem Ganda dan Metode Pelaksanaan Pekerjaan Kolom,Balok,dan Pelat

Zhafira, Rizky Dwi (2018) Perencanaan Ulang Struktur Hotel 12 Lantai di Malang Menggunakan Sistem Ganda dan Metode Pelaksanaan Pekerjaan Kolom,Balok,dan Pelat. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111410000073_Undergraduate-Theses.pdf]
Preview
Text
10111410000073_Undergraduate-Theses.pdf - Accepted Version

Download (17MB) | Preview

Abstract

Penyusunan tugas akhir yang berjudul Perencanaan Ulang Struktur Hotel 12 Lantai di Malang dengan Metode Sistem Rangka Pemikul Momen Khusus (SRPMK) dan Shearwall ini menggunakan data Hotel City Malang yang terletak di lokasi Jalan Dr. Cipto no.11 Malang, sebagai objek. Proyek dengan luas 1974 m² ini di desain dengan 13 lantai dengan fungsi rooftop sebagai taman. Namun dalam Tugas Akhir Terapan ini gedung akan direncanakan ulang menjadi 12 lantai dengan menggunakan atap deck beton. Klasifikasi Situs yang diperoleh berdasarkan Test SPT adalah Situs Kelas SD, maka digunakanlah metode Sistem Ganda (SRPMK dan Shearwall). Perhitungan struktur menggunakan metode sistem ganda yaitu sistem rangka pemikul momen khusus dan dinding geser yang mengacu pada SNI 03-1726-2012: Tata Cara Perencanaan Ketahanan Gempa untuk Struktur Bangunan Gedung dan Non-gedung. Perencanaan beban akibat gempa menggunakan respon spektrum desain. Sedangkan, pembebanan non-gempa mengacu pada SNI 03-1727-2013: Beban Minimum untuk Perancangan Bangunan Gedung dan Struktur Lain. Keseluruhan struktur adalah beton bertulang, yang mengacu pada SNI 03-2847-2013: Tata Cara Perhitungan Struktur Beton untuk Bangunan Gedung. Hasil dari perhitungan perencanaan ini, diperoleh struktur atas yaitu balok, kolom, plat lantai, plat tangga, dan dinding geser, yang diwujudkan dalam bentuk laporan perhitungan struktur dengan disertai gambar yang dapat dijadikan acuan dalam pelaksanaan pembangunan. Serta pada akhir perhitungan terdapat metode pelaksanaan kolom,balok,dan pelat.
======================================================================================================
This report used existing data of the project. It located in Dr.Cipto Street No,11 Malang with building area of 1974 m². This project is using Special Momen Resisting Frame system and Shearwall (Dual System) and has 13 floors with garden rooftop. In this report ,the building are modified into 12 floors with roof structure of concrete plate. Based on the Standard Penetration Test (SPT), it’s found that the soil of the building is medium condition (SD class) and based on its function, this building is included in risk of category II . So the building included into seismic design category D. The structural analysis use dual system method, which is Special Moment Rseisting Frame System and Shearwall refer to SNI 03-1726-2012 and SNI 03-1726-2013. The secondary structure like plate,stairways,and secondary beam were carried by the primary structure such as foundation,sloof,beam,column,joint of beam and column,and also shearwall. The entire structure is using concrete reinforcement that refer to SNI 03-2847-2013. From the analysis result and structure calculation, the dimention and the reinforcement of secondary beam,plate,stairways,primary beam,column,joint of beam and column,shearwall,sloof,and also shearwall are reported and will presented to engineering drawing for implementation of build. And after analysis structure result,there are construction method of column,beam,and plate.

Item Type: Thesis (Undergraduate)
Additional Information: RSIS 690.85 Zha p-1 3100018077848
Uncontrolled Keywords: Gedung beton bertulang,Sistem Ganda,Desain Respon Spektrum , Dinding Geser
Subjects: N Fine Arts > NA Architecture > NA7820 Hotels. Inns. Hotel lobbies For resorts
T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TA Engineering (General). Civil engineering (General) > TA645 Structural analysis (Engineering)
T Technology > TA Engineering (General). Civil engineering (General) > TA681 Concrete construction
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D3)
Depositing User: Rizky Dwi Zhafira
Date Deposited: 02 Dec 2020 03:10
Last Modified: 02 Dec 2020 03:10
URI: http://repository.its.ac.id/id/eprint/56104

Actions (login required)

View Item View Item