Gedung Bernofarm Pharmaceutical Company berada di Jalan Gatot Subroto No 68 Banjarkemantren Km.18, Sidoarjo. Berdasarkan Hasil Standart Penetration Test (SPT) diketahui bahwa gedung dibangun diatas tanah dengan kelas situs tanah sedang dan termasuk dalam kategori desain seismik C sehingga perencanaan struktur dapat menggunakan metode Sistem Rangka Pemikul Momen Menengah (SRPMM), yakni sistem struktur yang pada dasarnya memiliki rangka ruang pemikul beban gravitasi secara lengkap, dimana komponen struktur dan joint menahan gaya melalui lentur, geser dan gaya aksial. Sedangkan beban lateral yang diakibatkan oleh gempa dipikul oleh rangka pemikul momen melalui mekanisme lentur dengan salah satu syarat memiliki nilai kategori desain seismik minimal C.Perhitungan perencanaan struktur meliputi : struktur atas (sekunder dan utama) dan struktur bawah (sloof, poer dan pondasi) dengan menggunakan metode perhitungan SRPMM, sehingga struktur bangunan diharapkan mampu membatasi kerusakan gedung akibat gempa ringan sampai sedang, sehingga masih dapat diperbaiki dan membatasi ketidaknyamanan penghuni ketika terjadi gempa. Pedoman yang dipakai dalam analisa perencanaan struktur bangunan ini menggunakan SNI 03–2847–2013 untuk perhitungan struktural, SNI 1727 – 2013 dan PPIUG 1983 untuk perhitungan pembebanan gedung, SNI 03–1726-2012 untuk Standar Perencanaan Ketahanan Gempa Indonesia. Analisa perhitungan untuk keduanya dilakukan dengan alat bantu program SAP 2000 dan PCACOL. Beban gempa pada struktur dihitung dengan menggunakan metode analisa respons spectrum dinamis yang didefinisikan sebagai beban massa pada joint-joint dari struktur (joint mass). Hasil yang diperoleh daam penulisan Tugas Akhir Terapan (TAT) ini adalah meliputi ketentuan permodelan struktur dengan menggunakan sistem SRPMM, analisa gaya gaya pada struktur bangunan, kebutuhan penulangan serta gambar-gambar perencanaan struktur. Pada gambar akan dihasilkan gambar rencana denah struktur, gambar penulangan serta gambar detail yang meliputi gambar panjang penyaluran, panjang penjangkaran dan panjang kait-kait. Kata kunci: SRPMM, Struktur Atas, Stuktur bawah, Perhitungan Struktur, Respon Spektrum.
===========================================================================================================
Bernofram Pharmaceutical Company was build at Gatot
Subroto street No 68 Banjarkematren Km18, sidoarjo. Based on
Standard Penetration Test (SPT) result, known that it build on
intermediate hard soil KDS C with the result that t
he structure
calculation using Intermdiate Moment Frame System Method
(
IMF), that is a structural system basically has a complete gravity
load
-
carrying frame, where the structural and joint components
retain flexural, shear and axial forces. While the lat
eral load
caused by the earthquake is borne by the moment
-
carrying frame
through the flexural mechanism with one of the requirements to
have the value of the seismic design category minimum C
The calculation of structural planning includes: upper
structure
(roof, secondary and primary), and lower structure (Tie
iv
Beam, Pile Cap, and Foundation) using IMF calculation method
the results that the building structure be expected to limit the
damage of buildings due to mild until medium earthquakes, and
limit the d
iscomfort of residents when an earthquake occur.
The guidelines used in this structural building planning
analysis use SNI 03
-
2847
-
2013 for structural calculations, SNI
1727
-
2013 and PPIUG 1983 for building load calculation, SNI
03
-
1726
-
2012 for Indonesi
an Earthquake Defense Planning
Standard.
the modeling and analysis using program SAP 2000 v
12.0.2 and PCACOL.
Earthquake loads on structure are calculated
using dynamic spectrum response analysis methods that are
defined as mass loads on joints of a struc
ture (joint mass).
The results obtained in this final assignment applied
(TAT) include the provision of structural modeling using IMF system, forces analysis on building structure, reinforcement requirement and structural planning drawings. In the drawings will be generated drawings of structural skecth plans, reinforcement images and detailed images that include long drawing images, length of anchoring and the length of the hooks
Item Type: | Thesis (Diploma) |
---|---|
Additional Information: | RSIS 690.73 Khu p-1 3100018077556 |
Uncontrolled Keywords: | SRPMM, Struktur Atas, Stuktur bawah, Perhitungan Struktur, Respon Spektrum, op Structure, Bottom Structure Planning Analysis, Spectrum Respons |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TA Engineering (General). Civil engineering (General) > TA645 Structural analysis (Engineering) |
Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D3) |
Depositing User: | zahamakbarilah zahamakbarilah |
Date Deposited: | 02 Aug 2018 05:15 |
Last Modified: | 21 Dec 2020 07:07 |
URI: | http://repository.its.ac.id/id/eprint/57029 |
Actions (login required)
View Item |