Atiqur, Rahman (2018) Perhitungan Biaya Pelaksanaan Struktur Utama Serta Waktu Pelaksanaan Pembangunan The Coral Hotel-Solo. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
10111410000069-Undergraduate_Theses .pdf - Accepted Version Download (32MB) | Preview |
Abstract
Proyek pembangunan The Coral Hotel Solo adalah proyek pembangunan hotel yang berada di alamat jalan Kyai Mojo, Pasar Kliwon Solo. Proyek pembangunan hotel dengan jumlah 10 lantai yang berada pada lahan seluas 400 m2 dengan luas bangunan 328, 3 m2 tersebut menggunakan metode pengecoran setempat. Dimana dalam pelaksanaan pembangunanya sendiri meliputi pekerjaan persiapan, galian dan timbunan, pondasi, pekerjaan pengecoran dan dalam pekerjaannya menggunakan alat berat untuk memudahkan dan mempercepat pekerjaan. Hal yang pertama kali harus dilakukan dalam proses perencanaan pembangunan The Coral Hotel Solo adalah merencanakan anggaran biaya pelaksanaanya. Tahap awal dalam perhitungan biaya pelaksanaan haruslah melakukan analisa terlebih) dan memperhitungkan volume pekerjaan dan durasi tiap item pekerjaan yang akan dilakukan. Sedangkan untuk memperkirakan durasi pekerjaan harus dilakukan analisa awal dimana analisa tersebut memperhitungkan dari kapasitas produksi, produktivitas, durasi, dan koefisien. Sedangkan dalam pekerjaan perhitungan durasi dapat menggunakan alat bantu yaitu Microsoft project.
=================================================================================================
The construction project of The Coral Hotel Solo is a hotel development project located on the street address Kyai Mojo, Pasar Kliwon Solo. The hotel construction project with a total of 10 floors located on an area of 400 m2 with a building area of 328, 3 m2 is using the method of local foundry. Where in the implementation of the builder itself includes preparatory work, excavation and embankment, foundation, foundry work and in his work using heavy equipment to facilitate and speed up the work. The first thing to do in the development planning process of The Coral Hotel Solo is to plan the budget for implementation cost. Initial stage in the calculation of the cost of implementation must do the analysis first) and take into account the volume of work and the duration of each item of work to be done. While to estimate the duration of the work must be done early analysis where the analysis takes into account of the production capacity, productivity, duration, and coefficients. While in the work of calculation duration can use the tool that is Microsoft project.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Budget plan implementation cost, Duration of work, micosoft project |
Subjects: | T Technology > T Technology (General) > T56.8 Project Management |
Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering > 22301-(D4) Diploma 4 |
Depositing User: | M. Atiqur Rahman |
Date Deposited: | 04 Aug 2021 23:49 |
Last Modified: | 04 Aug 2021 23:49 |
URI: | http://repository.its.ac.id/id/eprint/57948 |
Actions (login required)
View Item |