Dalam dunia industri banyak persaingan yang terjadi untuk memenuhi
kebutuhan konsumen. Persaingan tersebut meliputi produk, proses produksi maupun
kinerja dari industri. Produk yang dimaksud adalah hasil dari produksi dimana ada
atau tidaknya cacat. Untuk proses produksi dapat dilihat dari peralatan yang
digunakan, waste yang dihasilkan, serta waktu tunggu antar proses. Kinerja industri
dilihat dari jam kerja, kedisiplinan pekerja, serta keahlian pekerja.
Adapun yang menjadi perumusan masalah pada penelitian ini adalah
menganalisa dan meminimalkan waste pada proses produksi U-ditch dengan
pendekatan Lean Manufacturing. Waste sendiri didefinisikan sebagai segala aktivitas
kerja yang tidak memberikan nilai tambah dalam proses transformasi input menjadi
output sepanjang value stream.
Berdasarkan hasil penelitian, didapatkan jenis pemborosan yang paling sering
terjadi adalah waiting (21.30%), defective parts (18.34%), dan movement (17.75%).
Mapping tools yang digunakan berdasarkan hasil konversi skor kuisioner ke dalam
matriks VALSAT adalah Process Activity Mapping (42.00%) dan Supply Chain
Response Matrix (20.21%). Dari process activity mapping dapat diketahui bahwa
proporsi waktu aktivitas tranportation sebesar 26.84 %, aktivitas ini termasuk
aktivitas necessary non added value. Setelah perbaikan, dilakukan proporsi waktu
aktivitas tranportation menjadi 11.58 %. Untuk nilai Value Added Ratio (VAR)
sebelum perbaikan sebesar 49.13% setelah penerapan perbaikan nilai VAR menjadi
52.87%.
============================================================
In the industrial world a lot of competition occur to meet the needs of
consumers. The competition includes the products, production processes and the
performance of the industry. The product is the result of a production in defects of
product. For the production process can be seen from the equipment used, waste
produced, and the waiting time between processes. Industry performance can be seen
from hours worked, labor discipline, and the expertise of workers.
The problems in this research are to analyze and minimize waste in
production processes U-ditch using Lean Manufacturing approach. Waste is defined
as any work activities that do not provide value added in the process of transforming
inputs into outputs throughout the value stream.
Based on this research, they were found that the most frequent types of waste
occurs is waiting (21.30%), defective parts (18.34%), and movement (17.75%).
Mapping tools used by the results of the questionnaire scores conversion into
VALSAT matrix is Process Activity Mapping (42.00%) and Supply Chain Response
Matrix (20.21%). From process mapping activity can be seen that the proportion of
time of 26.84 % transportation activity, this activity includes necessary non-added
value activities. After the repair, do the proportion of time transportation activity
becomes 11.58 %. For Value Added Ratio (VAR) before an improvement of 49.13%
after the application of the VAR value improvement to 52.87%.

Item Type: Thesis (Masters)
Additional Information: RTMT 658.5 Rir p
Uncontrolled Keywords: Lean Manufacturing, value stream,VALSAT, Value Added Ratio
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD56.25 Industrial efficiency--Measurement. Industrial productivity--Measurement.
T Technology > TS Manufactures > TS156 Quality Control. QFD. Taguchi methods (Quality control)
Divisions: 61101-Magister Management Technology
Depositing User: ansi aflacha
Date Deposited: 29 Nov 2018 02:47
Last Modified: 29 Nov 2018 02:47
URI: http://repository.its.ac.id/id/eprint/60047

Actions (login required)

View Item View Item