Abstract

Berdasarkan data statistik ketenagalistrikan bahwa rasio elektrifikasi Kalimantan Barat baru mencapai 82,38 % pada tahun 2015. Kebutuhan tenaga listrik di Provinsi Kalimantan Barat tahun 2000-2017 tumbuh rata-rata 4,57% per tahun. Di PT. PLN (Persero) secara berkala dibuat rencana pengembangan 10 tahunan untuk memenuhi kebutuhan listrik di Kalimantan Barat. Untuk mendapatkan rencana pengembangan yang lebih optimal, PLN berencana membuat Master Plan sistem kelistrikan se Kalimantan sampai dengan tahun 2050. Salah satu tahapan untuk membuat Master Plan tersebut adalah membuat rencana pengembangan pembangkit regional Kalimantan Barat, yang selanjutnya akan digunakan sebagai rujukan untuk menilai tingkat keekonomiannya. Kebutuhan listrik di Kalimantan Barat kedepan diperkirakan akan tumbuh rata-rata 6,37% per tahun selama periode 2018-2050. Provinsi Kalimantan Barat memiliki potensi sumber energi primer yang terdiri dari potensi batubara sekitar 160,6 juta ton dan potensi tenaga air sekitar 198 MW. Dalam membuat rencana pengembangan pembangkit sistem kelistrikan Kalimantan Barat ini, akan merujuk pada kriteria total biaya penyediaan listrik termurah (least cost) dengan tingkat keandalan tertentu yaitu LOLP < 0,274% selama periode waktu perencanaan. Dari hasil simulasi perhitungan dan analisa dengan menggunakan software aplikasi WASP, diperoleh konfigurasi kebutuhan pembangkit se Kalimantan Barat dengan total biaya penyediaan listrik (NPV) sebesar USD 18,8 miliar dan nilai keandalan antara 0,095% sampai 0,273%. ================================================================================================
Based on electricity statistics, the electrification ratio of West Kalimantan has only reached 82.38% in 2015. The demand for electricity in the Province of West Kalimantan in 2000-2017 grew at an average of 4.57% per year. At PT. PLN (Persero) is regularly developing a 10-year development plan to meet electricity needs in West Kalimantan. To get a more optimal development plan, PLN plans to create an Electricity Master Plan for Kalimantan up to 2050. One of the stages to make the Master Plan is to plan the development of the West Kalimantan regional plant, which will then be used as a reference to assess its economic level. Electricity needs in West Kalimantan in the future are expected to grow by an average of 6.37% per year over the period 2018-2050. The province of West Kalimantan has the potential of primary energy sources consisting of the potential of coal around 160.6 million tons and the potential of hydropower around 198 MW. In making plans to develop the West Kalimantan electricity system, it will refer to the criteria for the total cost of providing the cheapest electricity (least cost) with a certain level of reliability, namely LOLP <0.274% during the planning period. From the simulation results of calculations and analysis using WASP application software, the configuration of the needs of plants in West Kalimantan was obtained with a total cost of electricity supply (NPV) of USD 18.8 billion and reliability values between 0.095% to 0.273%.

Item Type: Thesis (Undergraduate)
Additional Information: RSE 621.31 Ass s-1 2019
Uncontrolled Keywords: Perencanaan Pembangkit, Potensi energi, WASP
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1001 Production of electric energy or power
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1007 Electric power systems control
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1322.6 Electric power-plants
Divisions: Faculty of Intelligent Electrical and Informatics Technology (ELECTICS) > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: Imam Faried Assalam
Date Deposited: 17 Sep 2021 19:51
Last Modified: 17 Sep 2021 19:51
URI: http://repository.its.ac.id/id/eprint/60388

Actions (login required)

View Item View Item