LNG Receiving Terminal Location Analysis And Feasibility Studies For Gresik, Lamongan And Tuban Power Plant Using Codasid And AHP Method In Northern East Java

Adinatha, Ngurah Bagus Surya (2019) LNG Receiving Terminal Location Analysis And Feasibility Studies For Gresik, Lamongan And Tuban Power Plant Using Codasid And AHP Method In Northern East Java. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 04211441000037-Undergraduate_Theses.pdf] Text
04211441000037-Undergraduate_Theses.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2022.

Download (3MB) | Request a copy

Abstract

Energi saat ini beralih dari energi fosil ke menggunakan tenaga gas alam karena jumlah energi dari fosil sudah mulai berkurang. Gas alam yang digunakan adalah gas melalui proses likuidasi, juga dikenal sebagai LNG (Liquified Natural Gas). Dengan kemajuan teknologi, energi yang dihasilkan dari LNG dapat bermanfaat untuk membantu kehidupan manusia. Namun, di Indonesia, teknologi yang mampu mengubah energi dari gas alam jumlahnya masih relatif kecil. Indonesia mulai membangun berbagai fasilitas mulai dari situs untuk regasifikasi atau gudang penyimpanan yang digunakan untuk menghasilkan energi yang dapat dinikmati oleh semua orang Indonesia. Salah satu fasilitas yang akan dibahas dalam tugas akhir ini adalah terminal penerimaan LNG yang akan dibangun di utara Jawa Timur oleh PT.X, yang akan digunakan untuk mendistribusikan energi listrik untuk Kabupaten Gresik, Kabupaten Lamongan dan Kabupaten Tuban, dengan menggunakan teknologi Floating Storage Regasification Unit atau bisa disingkat FSRU. FSRU adalah struktur terapung di lautan lepas yang digunakan sebagai tempat penyimpanan dan proses regasifikasi. Dalam perhitungan menggunakan metode CODASID dan AHP diperoleh hasil lokasi yang akan dibangun fasilitas Floating Storage Regasification Unit adalah area Weru Lamongan dengan nilai ideal 0,7198. Berdasarkan NPV, IRR, dan Payback Period, semua rentang margin layak dalam aspek ekonomi kecuali margin US $ 1,75. Proyek ini layak ketika harga jual LNG mulai dari margin US $ 2 (US $ 9 per MMBtu) dengan NPV US $ 16.007.365 dengan jangka waktu 7 tahun dan nilai IRR 14,68%.
================================================================================================
Energy is currently shifting from fossil energy to using natural gas power because the amount of energy from fossils has begun to decrease. Natural gas used is gas through a liquidation process, also known as LNG (Liquified Natural Gas). With technological advances, the energy produced from LNG can be useful to help human life. However, in Indonesia, the amount of technology that is able to convert energy from natural gas is still relatively small. Indonesia began to build various facilities ranging from sites for regasification or storage warehouses used to produce energy that could be enjoyed by all Indonesians. One of the facilities to be discussed in this final project is the LNG receiving terminal to be built in the north of East Java by PT.X, which will be used to distribute electrical energy to Gresik Regency, Lamongan Regency and Tuban Regency, using the Floating Storage Regasification Unit technology or abbreviated as FSRU . FSRU is a floating structure in the open ocean that is used as a storage and regasification process. In the calculation using the CODASID and AHP methods obtained the results of the location to be built Floating Storage Regasification Unit is the Weru Lamongan area with an ideal value of 0.7198. Based on NPV, IRR, and Payback Periods, all margin ranges are feasible in the economic aspect except margins of US $ 1.75. This project is feasible when the LNG selling price starts from a margin of US $ 2 (US $ 9 per MMBtu) with an NPV of US $ 16,007,365 with a period of 7 years and an IRR of 14.68%.

Item Type: Thesis (Undergraduate)
Additional Information: RSSP 623.802 89 Adi l-1 2019
Uncontrolled Keywords: CODASID, AHP, LNG, FSRU, Energi, Penyimpanan.
Subjects: H Social Sciences > HB Economic Theory > HB846.2 Cost benefit analysis
T Technology > T Technology (General)
T Technology > T Technology (General) > T56.8 Project Management
T Technology > T Technology (General) > T58.8 Productivity. Efficiency
V Naval Science > VK > VK358 Marine terminals
Divisions: Faculty of Marine Technology (MARTECH) > Marine Engineering > 36202-(S1) Undergraduate Thesis
Depositing User: Mr. Ngurah Bagus Surya Adinatha
Date Deposited: 25 Jan 2022 01:59
Last Modified: 25 Jan 2022 02:06
URI: http://repository.its.ac.id/id/eprint/62099

Actions (login required)

View Item View Item