Tata letak antara fasilitas dalam suatu proyek konstruksi
sangatlah penting yang apabila tidak direncanakan dengan
baik akan mengakibatkan terjadinya hambatan dalam pengerjaan
proyek tersebut. Perencanaan tata letak fasilitas harus
mempertimbangkan fungsi masing – masing fasilitas. Tugas akhir
ini bertujuan untuk melakukan optimasi tata letak fasilitas proyek
pembangunan Supermall Mansion Pakuwon Surabaya.
Dalam penelitian ini tata letak fasilitas akan dioptimasi
dengan menggunakan metode Multi Objectives Function atau
metode multi tujuan. Untuk mendapatkan hasil optimasi site
layout yang optimal maka jarak tempuh (travelling distance) dan
nilai tingkat keselamatan (safety index) harus diminimalkan agar
pekerjaan pada proyek tersebut tidak terhambat. Hasilnya akan
diiterasi beberapa kali untuk menemukan nilai dari jarak tempuh
(travelling distance) dan nilai dari tingkat keselamatan (savety
index) yang paling rendah. Dari hasil tersebut akan dibuat
sebuah grafik pareto optima untuk menentukan posisi letak
fasilitas yang paling optimal agar pekerjaan proyek konstruksi
tidak terhambat. Dari hasil iterasi yang dilakukan maka
ditemukan beberapa kali iterasi masing masing zona. Zona 1 didapatkan 12 kali iterasi dan zona 2 sebanyak 27 kali iterasi.
Dari iterasi - iterasi tersebut hasil nilai TD dan SI untuk masing
– masing zona (zona 1 dan zona 2) yang optimum adalah pada
alternatif 11 untuk zona 1 yang memiliki nilai TD sebesar
26971,09 meter dan nilai SI sebesar 300,64. Sedangkan untuk
zona 2 didapatkan nilai yang optimum pada alternatif 9 dengan
nilai TD sebesar 136531,22 meter dan nilai SI sebesar 1698,83.
Nilai – nilai tersebut dititik beratkan pada nilai TD yang
minimum sebab dengan nilai TD yang minimal proyek tersebut
bisa melakukan penghematan biaya dan waktu proyek
konstruksinya.
=============================================================================================================
On the construction project, site layout between facilities
is very important which is not in a good planning it will be an
obstacle to the project. The site layout facilities planning should
considered each function of the facilities. The final assignment is
purpose to do the optimation of site layout facilities of the
Supermall Mansion Pakuwon Surabaya project construction.
In this research of the site layout facilities will be
optimizing with Multi Objectives Function Method or Multi
Purpose Method. To get the optimum result of the layout
facilities, the traveling distance and safety index should be
minimized so the working on it’s project will not get slowed. The
result will be iterated several times to find the lowest value of of
the traveling distace and safety index. From that result pareto
optima graphic will be made to get the optimum position of layout
facilities. The iteration result will find multiple iteration each
zone. Zone 1 get 12 times iteration and zone 2 get 27 times
iteration. From those iteration the optimize value of TD snd SI for
each zone (zone 1 and zone 2) is on alternative 11 for zone 1 that
has TD value 26971,09 meters and SI value 1698,83. For zone 2
the optimize value is on alternative 9 with TD value is 136531,22 meters and SI value is 1698,83. Those value is pointing on the
minimum value of TD because it can use to saving the cost and
time of the project construction.
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | RSS 690.852 1 Cri o |
Uncontrolled Keywords: | Equal site; optimasi; safety index; site layout; traveling distance |
Subjects: | T Technology > TH Building construction > TH437 Building--Cost control. |
Divisions: | Faculty of Civil, Environmental, and Geo Engineering > Civil Engineering > 22201-(S1) Undergraduate Theses |
Depositing User: | - Taufiq Rahmanu |
Date Deposited: | 02 May 2019 06:25 |
Last Modified: | 02 May 2019 06:25 |
URI: | http://repository.its.ac.id/id/eprint/62904 |
Actions (login required)
View Item |