Amirudin, Muhammad Arifian (2019) Perhitungan Anggaran Biaya Dan Waktu Pelaksanaan Pada Proyek Pembangunan Apartemen Caspian, Superblok Grand Sungkono Lagoon – Kota Surabaya. Diploma thesis, Institut Teknologi Sepuluh Nopember.
Text
10111510000006-Undergraduate_Thesis.pdf Download (14MB) |
Abstract
Proyek Pembangunan Apartemen Caspian terletak di Jl. KH Abdul Wahab Siamin Blok RA Surabaya, merupakan salah satu pengembangan proyek properti terpadu Grand Sungkono Lagoon milik PT.PP Properti selaku owner yang terdiri dari 5 tower apartemen yaitu Tower Venetian, Tower Caspian, Tower 3, Tower 4, dan Tower 5 di lahan seluas 3,5 hektare. Proyek pembangunan gedung ini dikerjakan oleh kontraktor PT. PP Persero.Tbk. yang terdiri dari 48 lantai, dimana terdapat 1 lantai low ground dan 3 lantai basement. Pembagian lantai dalam Caspian Apartment yaitu lantai 1-5 digunakan sebagai podium yang terhubung dengan mall sedangkan lantai diatasnya digunakan sebagai hunian. Perhitungan biaya dan waktu pelaksanaan pada proyek ini dilakukan dengan perhitungan volume, produktivitas alat, durasi, dan penyusunan jadwal pada masing-masing item pekerjaan. Serta dilakukan pemilihan metode pelaksanaan yang efektif pada tiap item pekerjaan. Untuk biaya pelaksanaan menggunakan brosur dan standard harga di Kota Surabaya tahun 2016. Pada pembangunan proyek ini untuk perhitungan biaya dan waktu pelaksanaan khusus hanya untuk struktur utama bangunan dari lantai basement 3 sampai lantai 7. Dalam menentukan penjadwalan proyek dibantu menggunakan software Microsoft Project dengan hasil akhir didapatkan Rencana Anggaran Pelaksanaan berupa grafik Kurva-S.
=================================================================================================================================
Caspian Apartment Tower project which is located on KH Abdul Wahab Siamin Blok RA Surabaya, is a part of Grand Sungkono Lagoon major development project owned by PT.PP Properti. Grand Sungkono lagoon’s 3,5 hectares project consist of 5 apartment tower is Venetian Tower, Caspian Tower, Tower 3, Tower 4, and Tower 5. Caspian Apartment Tower has 48-story including a low ground floor and 3 basement floors. 1st to 5th floor will be used as podium which connected to the mall, while the upper level floor will be used as apartment block. The calculation of cost and duration on this project involves calculation of material quantites, equipment productivity, duration and planned schedule on each work section. Choosing the most effective and efficient construction method and strategies is also important. Construction cost calculation is based upon brochures and HSPK Surabaya 2016. The construction cost and duration is calculated for 3rd basement floor to 7th floor only. In order to obtain efficient project schedule, Microsoft Project software will be used which will generate S-Curve as the final output.
Item Type: | Thesis (Diploma) |
---|---|
Additional Information: | RSIS 692.5 Ami p-1 2019 |
Uncontrolled Keywords: | waktu pelaksanaan, biaya pelaksanaan, kurva S, time implementation, costs implementation, S-Curve |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Vocational > Civil Infrastructure Engineering (D4) |
Depositing User: | Muhammad Arifian Amirudin |
Date Deposited: | 16 Nov 2023 02:51 |
Last Modified: | 16 Nov 2023 06:59 |
URI: | http://repository.its.ac.id/id/eprint/64120 |
Actions (login required)
View Item |