Studi Pengaruh Keandalan Sistem Tenaga Listrik terhadap Biaya Pokok Produksi dengan mengembangkan PLT Hybrid (PLTD – PLTS – Battery Storage) pada Pulau Tri Nusa

Putra, Ida Bagus Yudistira Anggradana (2019) Studi Pengaruh Keandalan Sistem Tenaga Listrik terhadap Biaya Pokok Produksi dengan mengembangkan PLT Hybrid (PLTD – PLTS – Battery Storage) pada Pulau Tri Nusa. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 07111540000138-Undergraduate_Thesis.pdf]
Preview
Text
07111540000138-Undergraduate_Thesis.pdf

Download (2MB) | Preview

Abstract

Kondisi daerah Tri Nusa (Nusa Penida, Nusa Ceningan dan Nusa Lembongan) saat ini masih bersifat isolated karena jauh berada dari Pulau Bali. Selain itu tidak memungkinnya untuk terkoneksi ke sistem jaringan distribusi Bali. Hingga bulan Agustus 2018, sistem Tri Nusa ini memiliki beban puncak sebesar 7.250 kW dengan daya yang mampu yang dihasilkan dari pembangkit sewa sebesar 6000 kW dan pembangkit sendiri sebesar 1.400 kW sehingga memiliki daya cadangan sebesar 150 kW/2.07%. Menurut data load forecasting yang disimulasikan oleh PLN terdapat kenaikan 10-15% per tahun karena adanya peningkatan beban seiring kenaikan jumlah wisatawan yang mengunjungi daerah Tri Nusa. Untuk mengatasi hal tersebut, oleh karena itu akan direncanakan untuk mengembangkan PLT Hybrid yang terdiri dari PLTD, PLTS dan Battery Storage yang akan meminimalisasi Biaya Pokok Produksi (BPP). Selain itu dengan metode loss of load probability (LOLP) yang dapat mengevaluasi keandalan suatu sistem Pembangkit Listrik Tenaga Diesel (PLTD) serta sumber energi terbarukan berupa photovoltaic dan battery storage. ===============================================================================================================================
The condition of Tri Nusa (Nusa Penida, Nusa Ceningan and Nusa Lembongan) is currently isolated because it is far from Bali Island. Furthermore, it is impossible to connect to the Bali distribution network system. As August 2018, Tri Nusa Island has a peak load 7.250 kW with a power capability of generating at least 6.000 kW and self-generating power of 1.400 kW, which has a reserve power of 150 kW / 2.07%. According to the data load forecasting simulated by PLN, there is a 10-15% increase per year due to increasing of the number of tourists visiting the Tri Nusa area. To overcome this, it will be planned to evolve PLT Hybrid consisting of PLTD, PLTS and Battery Storage which will minimize Basic Cost Production (BPP). In addition, the loss of load probability (LOLP) method can evaluate the reability index of PLTD system and renewable energy sources composed of photovoltaic and battery storage.

Item Type: Thesis (Other)
Additional Information: RSE 621.319 Put s-1 2019
Uncontrolled Keywords: PLT Hybrid, Loss of Load Probability dan Biaya Pokok Produksi
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1001 Production of electric energy or power
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1322.6 Electric power-plants
T Technology > TS Manufactures > TS174 Maintainability (Engineering) . Reliability (Engineering)
Divisions: Faculty of Electrical Technology > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: Ida Bagus Yudistira Ida Bagus Yudistira
Date Deposited: 28 Mar 2023 02:14
Last Modified: 28 Mar 2023 02:14
URI: http://repository.its.ac.id/id/eprint/64403

Actions (login required)

View Item View Item