Sukamto, Aulia Qur`anna (2019) Model Interaksi Rantai Pasok di Proyek Konstruksi Berbasis Simulasi Agent-Based. Masters thesis, Institut Teknologi Sepuluh November.
|
Text
03111550030012-Master_Thesis.pdf Restricted to Repository staff only Download (2MB) | Request a copy |
Abstract
Industri konstruksi merupakan salah satu industri yang terlambat di bidang informasi, inovasi dan manajemen rantai pasok. Karena rantai pasok di industri konstruksi cenderung menunjukkan ketidakefisienan. Contohnya dalam aliran material di industri konstruksi masih sering terjadi keterlambatan disebabkan time order yang tidak direncanakan. Keterlambatan waktu kedatangan material dapat menyebabkan keterlambatan durasi proyek. Banyak faktor yang menyebabkan terlambatnya aliran material seperti profit, relationship, quality, safety, constructability dan recognition. Penelitian ini bertujuan untuk memodelkan sistem aliran material di proyek konstruksi dengan menginput faktor-faktor yang dianggap berpengaruh terhadap aliran material dan melakukan skenario terhadap model sistem tersebut. Data penelitian didapat dari wawancara dengan project manager proyek dan untuk gedung yang telah selesai yang ada di wilayah Jawa Timur. Dari hasil wawancara didapat data untuk input ke dalam model simulasi sebagai kondisi awal model. Dari hasil simulasi didapatkan hasil presentase keterlambatan untuk 100 kali replikasi simulasi sebesar 12,3%. Hasil simulasi di validasi dengan data aktual proyek VVIP Bhayangkara dengan presentase keterlambatan 15%. Selisih dari kedua data adalah 18% dan nilai akurasinya adalah 82%. Selanjutnya dilakukan perancangan skenario pada model simulasi, dilakukan 6 skenario dengan merubah parameter dari masing-masing faktor. Didapatkan hasil skenario 1 adalah skenario dengan probabilitas keterlambatan yang paling tinggi yaitu 14,55%. Dari hasil penelitian ini dapat diketahui dari hasil skenario bahwa didapatkan skenario pertama dengan bobot faktor kualitas sebessar 100% merupakan skenario yang memiliki presentaase keterlambatan paling tinggi yaitu 14,55%. Dari hasil skenario diketahui bahwa faktor kualitas material adalah faktor yang sangat berpengaruh pada aliran material dan memiliki probabilitas yang cukup tinggi untuk menyebabkan keterlambatan proyek. Sehingga perlu dilakukannya quality control untuk material dan juga perlu adanya negosiasi di awal proyek terkait dengan pengadaan material sehingga proses konstruksi tidak terganggu oleh aliran material. Oleh karena itu diperlukan peran yang baik dari kontraktor agar keterlambatan proyek dapat diminimalisir serta perlunya komunikasi yang baik antar semua agen yang terlibat. ==============================================================================================================================
The construction industry is one industry that is late in the field information, innovation and supply chain management. Because of the supply chain in the industry construction tends to show inefficiency. Example in flow material in the construction industry is still often delayed due to time unplanned order. The delay in arrival of material can be causing delay in the duration of the project. Many factors cause late flow of material such as profit, relationship, quality, safety, constructability and recognition. This study aims to model material flow system in construction projects by inputting the factors considered influential on the flow of material and doing scenarios against the system model. Research data was obtained from interviews with project project managers and for completed buildings in the East Java region. From the results interviews obtained data for input into the simulation model as a condition the start of the model. From the simulation results, the percentage of delay is obtained 100 times replication simulation of 12.3%. Simulation results are validated with data actual Bhayangkara VVIP project with a percentage delay of 15%. Difference of the two data is 18% and the accuracy value is 82%. Next scenario design is carried out on the simulation model, 6 scenarios are performed by changing the parameters of each factor. Scenario results obtained 1 is a scenario with the highest probability of delay that is 14.55%. From the results of this study can be seen from the results of the scenario that obtained the first scenario with the quality factor quality as 100% is a scenario that has the highest percentage of delay that is 14.55%. From the results of the scenario it is known that material quality factors are factors that greatly influence material flow and have probabilities which is high enough to cause project delays. So it is necessary quality control for material is carried out and negotiations are also needed at the beginning of the project is related to the procurement of material so that the construction process does not disturbed by material flow. Therefore a good role is needed contractor so that project delays can be minimized as well as the need good communication between all agents involved.
| Item Type: | Thesis (Masters) |
|---|---|
| Uncontrolled Keywords: | rantai pasok konstruksi, aliran material, agent-based simulation. |
| Subjects: | H Social Sciences > HD Industries. Land use. Labor H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management H Social Sciences > HD Industries. Land use. Labor > HD69.T54 Time management. Scheduling |
| Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering > 22101-(S2) Master Thesis |
| Depositing User: | Aulia Qur`anna Sukamto |
| Date Deposited: | 22 Jul 2026 06:39 |
| Last Modified: | 22 Jul 2026 06:39 |
| URI: | http://repository.its.ac.id/id/eprint/65111 |
Actions (login required)
![]() |
View Item |