Adelina, Safira (2019) Perbaikan Proses Produksi Dengan Eliminasi Waste Menggunakan Pendekatan Lean Manufacturing Pada Pt Varia Usaha Beton. Other thesis, Institut Teknologi Sepuluh Nopember.
|
Text
02411540000021-Undergraduate_ThesIs.pdf Restricted to Repository staff only Download (4MB) | Request a copy |
Abstract
PT Varia Usaha Beton merupakan perusahaan yang bergerak di bidang konstruksi sebagai pemasok berbagai macam produk dengan bahan baku semen. Salah satu produk yang dihasilkan adalah tiang pancang 20x20. Pada pembuatan squares pile 20x20, masih ditemukan permasalahan yaitu ketidaktercapaian target produksi dan terhambatnya kelancaran proses produksi. Indikasi permasalahan tersebut disebabkan oleh kurangnya ketersediaan lahan penyimpanan dan adanya waktu menunggu datangnya truk mixer. Selain itu juga terdapat permasalahan pada layout area fabrikasi dimana tidak terdapat batas yang jelas antar stasiun kerja, serta penataan raw material, work in process (WIP), dan finished good yang tidak tersusun secara rapi. Kelancaran proses produksi yang masih terhambat tersebut berdampak pada kerugian finansial, pembayaran denda kepada konsumen, serta perusahaan perlu mengejar rencana produksi periode selanjutnya. Penelitian ini bertujuan untuk mengurangi waste pada proses produksi beton dengan menggunakan pendekatan lean manufacturing. Pada penelitian ini akan dimulai dengan pemetaan proses produksi eksisting dengan value stream mapping dan process activity mapping. Selanjutnya dilakukan identifikasi waste kritis beserta akar penyebab permasalahan menggunakan 5 why’s dan lean assessment matrix. Berdasarkan hasil pemetaan lean matrix 1, didapatkan 3 waste kritis yaitu ketidaktersediaan raw material (waiting), terjadinya kerusakan mesin atau alat (waiting), dan terdapat defect pada beton tiang pancang. Selanjutnya berdasarkan hasil lean matrix 2, terdapat 2 rekomendasi terpilih berdasarkan hasil diskusi dengan Pengawas Produksi yaitu membangun kemitraan dalam jangka panjang dengan vendor dan perbaikan sistem penjadwalan preventive maintenance untuk pan mixer pada batching plant. Penerapan rekomendasi perbaikan tersebut dapat mengurangi waktu menunggu dan proses produksi dapat berjalan lebih efisien.
==============================================================================================================================
PT Varia Usaha Beton is a business to business construction company supplying various products with cement as raw materials. One of the products produced is 20x20 squares pile. In 20x20 squares pile production, failure of production targets and delay are found due to the lack of availability of storage space, long waiting of mixer truck arrival, no clear boundaries between work stations in fabrication area and the arrangement of raw materials, work in process (WIP) and finished product are not neat. Those problems affected the financial loss, charge payment to customer and the need to pursue the next period of production plans. This research aims to decrease the wastes in production process by using lean manufacturing approach. This research starts with existing production process mapping with value stream mapping and process activity mapping. Critical wastes are identified along with the root causes by using 5 why’s and lean assessment matrix. Based on lean matrix 1 mapping result, 3 critical wastes are unavailability of raw material (waiting), machine damage (waiting) and defect in 20x20 squares pile. Based on lean matrix 2, two recommendations are selected based on discussion with Production Supervisor which is to build a long-term partnership with vendor and improving the preventive maintenance scheduling system for the pan mixer batching plant. The implementation of recommendations for improvement can reduce waiting time and the production process can run more efficiently.
| Item Type: | Thesis (Other) |
|---|---|
| Uncontrolled Keywords: | Industri Beton Pracetak, Value Stream Mapping (VSM), 5 Why’s, Lean Assessment Matrix, Waste, Lean Manufacturing. |
| Subjects: | T Technology > TS Manufactures > TS167 Costs, Industrial T Technology > TS Manufactures > TS176 Manufacturing engineering. Process engineering (Including manufacturing planning, production planning) |
| Divisions: | Faculty of Industrial Technology > Industrial Engineering > 26201-(S1) Undergraduate Thesis |
| Depositing User: | Safira Adelina |
| Date Deposited: | 21 Jul 2026 08:30 |
| Last Modified: | 21 Jul 2026 08:30 |
| URI: | http://repository.its.ac.id/id/eprint/65323 |