PT. Trakindo Utama adalah perusahaan yang menyediakan layanan perbaikan dan pemeliharaan untuk alat berat jenis Caterpillar. Salah satu pekerjaan yang dilakukan oleh perusahaan adalah merombak mesin. Mesin akan dibongkar untuk menemukan kerusakan yang dilaporkan atau mendeteksi bagian yang tidak cocok untuk digunakan dan harus diganti. Setelah itu, mesin digabungkan kembali sesuai rencana. Diperlukan proses perencanaan untuk mencari tahu berapa lama waktu yang dibutuhkan untuk menyelesaikannya. Namun berdasarkan sampel, tidak ada perencanaan yang sejalan dengan proses yang sebenarnya. Proses yang terjadi pada proses perbaikan tidak cukup efisien dikarenekan terdapat beberapa masalah yang terjadi. Ini membuktikan adanya waste dalam proses aktual yang menyebabkan hilangnya waktu dalam kegiatan yang dilakukan. Penelitian ini bertujuan untuk menghilangkan waste dalam proses perombakan mesin dengan menggunakan pendekatan Lean Manufacturing. Waste yang digunakan dalam penelitian ini adalah defect, inventory, motion, transportation, process, waiting dan underutilized capability. Penelitian dimulai dengan mengidentifikasi proses perbaikan dan limbah dengan menggunakan Value Stream Mapping (VSM) dan Waste Assessment Model (WAM). WAM digunakan untuk mendeteksi lokasi limbah kritis berdasarkan 7 klasifikasi limbah dan limbah kritis yang ditemukan adalah cacat, gerak, dan inventaris. Setelah itu, analisis akar permasalahan dilakukan menggunakan Root Cause Analysis (RCA) 5 Why’s. Perbaikan alternatif akan dilakukan berdasarkan data. Rekomendasi yang diberikan adalah SOP untuk alat, peningkatan bagian dan manajemen penggunaan alat, pelatihan untuk teknisi, 5S, dan perencanaan umum dan tata letak bengkel.
=====================================================================================================================================
PT. Trakindo Utama is a company that provides repair and maintenance services for Caterpillar type heavy machinery. One of the works done by the company is to overhaul the engine. The engine will be disassembled to locate the damage reported or detect parts that are not suitable for use and must be replaced. After that, the engine is recombined according to the plan. Planning process is needed to find out how long it will take to finish. But based on the sample, there is no planning that is in line with the actual process. The process that happens on the overhauling process is not efficient enough due to some problems that occurs. This proves the existence of waste in the actual process which causes a time loss in the activities carried out. This study aims to eliminate waste in the process of overhauling the engine by using the Lean Manufacturing approach. The waste used in the research are defect, inventory, motion, transportation, processing, waiting and underutilized capability. The research begins by identifying the process of overhaul and waste by using Value Stream Mapping (VSM) and Waste Assessment Method (WAM). WAM is used to detect critical waste locations based on 7 waste classifications and the critical waste that were found are defect, motion, and inventory. After that, the root cause analysis is carried out using Root Cause Analysis (RCA) 5Why’s. Alternative improvements will be made based on the data. The recommendations given are SOP for tools, improvement of parts and tools usage management, training for technicians, 5S, and the general planning and layout of the workshop.

Item Type: Thesis (Other)
Uncontrolled Keywords: Lean Manufacturing Root Cause Analysis (RCA), Value Stream Mapping (VSM), Waste Assessment Model (WAM),
Subjects: T Technology > T Technology (General) > T58.8 Productivity. Efficiency
Divisions: Faculty of Industrial Technology > Industrial Engineering > 26201-(S1) Undergraduate Thesis
Depositing User: Mr Nauval Rifqy
Date Deposited: 22 Jul 2026 06:02
Last Modified: 22 Jul 2026 06:02
URI: http://repository.its.ac.id/id/eprint/65877

Actions (login required)

View Item View Item