Perencanaan Pembangkit Listrik Tenaga Air Di Bendungan Beringin Sila Nusa Tenggara Barat

Karindra, Ganggas (2019) Perencanaan Pembangkit Listrik Tenaga Air Di Bendungan Beringin Sila Nusa Tenggara Barat. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111540000127-Undergraduate_Thesis.pdf] Text
03111540000127-Undergraduate_Thesis.pdf
Restricted to Repository staff only

Download (17MB) | Request a copy

Abstract

Kabupaten Sumbawa Nusa Tenggara Barat memiliki potensi dalam sektor pariwisata karena di kawasan tersebut termasuk dalam 10 kawasan terbaik di dunia dalam Halal Travel Indicator. Namun perkembangan sektor pariwisata terhambat dikarenakan ketersediaan listrik Kawasan tersebut masih kurang. Selain itu, NTB memiliki Proyek Strategis yaitu Bendungan Beringin Sila. Bendungan tersebut terletak di Utan, Kabupaten Sumbawa, NTB, memiliki kapasitas tampungan sebesar 40.500.000 m3 air dan tinggi 84 m untuk mengairi 3.500 hektar (ha) sawah. Namun Bendungan Beringin Sila masih dapat dimanfaatkan atas potensi yang ada dan menjawab permasalahan dalam ketersediaan listrik NTB. Pembangkit Listrik Tenaga Air (PLTA) adalah salah satu bentuk pemanfaatan potensi Bendungan Beringin Sila NTB. PLTA adalah pembangkit yang mengandalkan tinggi energi potensial air tampungan yang kemudaian akan menghasilkan energi listrik. Dalam perencanaan pemanfaatan ketersediaan air dari Bendungan Beringin Sila untuk PLTA dibutuhkan beberapa data antara lain, dimensi Elevasi, topografi dan laporan perencanaan dari Bendungan Beringin Sila.
Dalam penelitian ini dilakukan proses Pengumpulan data topografi didapatkan tinggi tekanan air (Head) yang nantinya dimanfaatkan sebagai tenaga untuk menggerakkan turbin. Kemudian, dari data debit ketersediaan air bendungan diolah dan dapatkan debit andalan yang digunakan untuk mendesain PLTA. Selanjutnya perencanaan dimensi dari Bangunan air yang diperlukan antara lain, pintu intake, pipa pesat, surge tank serta turbin yang akan digunakan. Setelah perencanaan bangunan air yang dibutuhkan, dilanjutkan perhitungan daya listrik yang dihasilkan dan gambar perencanaan dari PLTA tersebut.
Dari penelitian ini terlihat bahwa Bendungan Beringin Sila berpotensi untuk dimanfaatkan sebagai salah satu sumber listrik untuk Masyarakat NTB. Penelitian ini akan membahas perencanaan PLTA Bendungan Beringin Sila sehingga akan menghasilkan perencanaan dan Gambar yang sesuai dengan persyaratan yang digunakan dalam perancangannya
==============================================================================================================================
Sumbawa Regency of West Nusa Tenggara has potential in the tourism sector because it is among the 10 best regions in the world on the Halal Travel Indicator. Yet the development of the tourism sector is hampered due to the lack of electricity in the area. In addition, West Nusa Tenggara has a Strategic Project named the Sila Beringin Dam. The dam located in Utan, Sumbawa Regency, NTB, has a storage capacity of 40.500.000 m3 of water and is 84 m high to irrigate 3.500 hectares (ha) of rice fields. However, the Beringin Sila Dam can still be utilized for its existing potential and answer the problems on the availability of electricity in West Nusa Tenggara. Hydroelectric Power Plant is one of the potential utillization of the West Nusa Tenggara Sila Banyan Dam. Hydroelectric Power Plant relies on high potential energy of reservoir water, which will then reduce electrical energy. In planning the utilization of water availability fro the Beringin Sila Dam for hydropower, some data is needed, including elevation, topography, and planning reports from the Sila Banyan Dam.
In this study, a topographic data collection process was obtained – high water pressure (head) later was used as energy to drive the turbine. Afterwards, from the discharge data, the availabiliry of dam water is calculated to get the mainstay discharge that will be used design the hydropower plant design. Furthermore, the water buildings needed will be planned, including intake doors, fast pipes, surge tanks and turbines. After doing so, the calculation of the electricity produced by the hydropower plant and the drawings of hydropower plant planning will be carried out.
From this study, it’s clear that the Sila Banyan Dam has the potential to be used as a source of electricity for the West Nusa Tenggara community. This study will discuss the planning of the Sila Banyan Dam Hydropower Plant hence it will produce planning and drawings that are in accordance with the requirements used in the design.

Item Type: Thesis (Other)
Uncontrolled Keywords: Pembangkit Listrik Tenaga Air; Tinggi Jatuh Air; Turbin; Pipa Pesat; Surge Tank
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC167 Dams, reservoirs
T Technology > TC Hydraulic engineering. Ocean engineering > TC424 Water levels
T Technology > TC Hydraulic engineering. Ocean engineering > TC555 Spillways. Energy dissipation. Hydraulic jump.
T Technology > TC Hydraulic engineering. Ocean engineering > TC812 Irrigation
T Technology > TJ Mechanical engineering and machinery > TJ266 Turbines. Turbomachines (General)
T Technology > TJ Mechanical engineering and machinery > TJ930 Pipelines (General). Underwater pipelines.
Divisions: Faculty of Architecture, Design, and Planning > Architecture
Depositing User: Ganggas Karindra
Date Deposited: 22 Jul 2026 06:17
Last Modified: 22 Jul 2026 06:17
URI: http://repository.its.ac.id/id/eprint/67869

Actions (login required)

View Item View Item