Analisis Penentuan Rute Pemasangan Kabel Listrik Bawah Laut dari Pulau Bangka ke Pulau Belitung

Sari, Afiska Pranurika (2019) Analisis Penentuan Rute Pemasangan Kabel Listrik Bawah Laut dari Pulau Bangka ke Pulau Belitung. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 04311540000031-Undergraduate_Theses.pdf] Text
04311540000031-Undergraduate_Theses.pdf
Restricted to Repository staff only

Download (4MB) | Request a copy

Abstract

Bangka Belitung tercatat sebagai provinsi dengan Biaya Pokok Penyediaan (BPP) tertinggi di Sumatera karena sampai saat ini masih terisolasi dari sistem transmisi Sumatera dan sebagian besar bergantung pada PLTD. Untuk mengatasi hal tersebut, direncanakan penghubungan energi listrik ke Bangka Belitung sehingga dapat tersuplai dari pembangkit di Sumatera dengan pemasangan kabel listrik bawah laut. Oleh karena itu diperlukan adanya penentuan rute kabel laut. Pada Tugas Akhir ini terdapat tiga alternatif rute kabel laut yang direncanakan dari Pulau Bangka ke Pulau Belitung, yaitu Rute 1, Rute 2, dan Rute 3. Kriteria yang digunakan untuk pemilihan adalah panjang kabel laut, daerah persebaran ranjau, area labuh jangkar, dan crossing dengan metode pemilihan Analytical Hierarchy Process. Hasil analisis pada area studi yaitu Selat Gaspar tidak terdeteksi adanya persebaran ranjau dan bebas dari area labuh jangkar. Dari perhitungan panjang kabel laut, Rute 1 memiliki panjang 97 km, Rute 2 110 km, dan Rute 3 sepanjang 190 km. Diantara ketiga rute ini tidak ada yang terjadi crossing dengan pipa/ kabel laut existing. Berdasarkan hasil pembobotan dan penilaian yang terpilih menjadi rute kabel laut dair Pulau Bangka ke Pulau Belitung adalah Rute 1 dengan nilai 8.721. Pada prioritas kedua terdapat Rute 2 dengan nilai 8.594, kemudian terakhir Rute 3 dengan nilai 8.518.
=========================================================
Bangka Belitung is listed as the province with the highest cost of supply in Sumatera, because until now Bangka Belitung is still isolated from Sumatera transmission system and depend on diesel power plant. To overcome this problem, it is planned to connect electrical energy to Bangka Belitung so it can be supplied from power plant in Sumatera by installing submarine electrical cables. Therefore it is necessary to determine the submarine cable route. In this Final Project there are three alternative of submarine cable routes planned from Bangka Island to Belitung Island, it is Route 1, Route 2, and Route 3. The criteria used for selection submarine cable route are the length of submarine cable, mine distribution area, anchorage area, and crossing with the pipe or cable existing. The selection method is Analytical Hierarchy Process. The result of the analysis in the study area (Gaspar Strait), did not detect any mine spread and were free from the anchorage area. From the calculation of the length of submarine cable route, Route 1 has a length of 97km, Route 2 has a length of 110 km, and Route 3 has a length of 190 km. Among these three routes there is no one that crossing with existing submarine pipelines or cables. Based on the weighting and the rating results, the alternative chosen to be submarine cable route from Bangka Island to Belitung Island is Route 1 which has a value of 8.721. In the second priority there is Route 2 which has value of 8.594, and then the last is Route 3 with value of 8.518.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Analytical Hierarchy Process, area labuh jangkar, daerah persebaran ranjau, crossing
Subjects: T Technology > T Technology (General)
T Technology > TC Hydraulic engineering. Ocean engineering
Divisions: Faculty of Marine Technology (MARTECH) > Ocean Engineering > 38201-(S1) Undergraduate Thesis
Depositing User: Afiska Pranurika Sari
Date Deposited: 04 Jun 2026 05:34
Last Modified: 04 Jun 2026 05:34
URI: http://repository.its.ac.id/id/eprint/69486

Actions (login required)

View Item View Item