Desain Kapal Katamaran 3-in-1 Penumpang-Kontainer-Kendaraan dengan Rute Dermaga Boom Marina, Banyuwangi - Pelabuhan Benoa, Bali

Azam, Abdullah (2020) Desain Kapal Katamaran 3-in-1 Penumpang-Kontainer-Kendaraan dengan Rute Dermaga Boom Marina, Banyuwangi - Pelabuhan Benoa, Bali. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 04111340000054_Undergraduate_Thesis.pdf]
Preview
Text
04111340000054_Undergraduate_Thesis.pdf

Download (8MB) | Preview

Abstract

Sejak 12 September 2015 lalu Pantai Boom Banyuwangi sedang dalam proses pembangunan oleh pemerintah daerah menjadi dermaga kapal pesiar dan berganti nama menjadi Dermaga Boom Marina Banyuwangi yang diharapkan menjadi bagian dari jaringan marina dunia sekaligus untuk mempromosikan wisata bahari Indonesia di dunia Internasional. Dermaga ini kemudian dikoneksikan dengan pelabuhan Benoa, Bali. Namun hingga saat ini belum ada alat transportasi laut yang beroperasi di jalur pelayaran tersebut. Pada Tugas Akhir ini akan didesain kapal katamaran 3-in-1 penumpang-kontainer-kendaraan dengan metode point-based design hingga tahap analisis ekonomisnya. Dari serangkaian proses desain didapatkan kapasitas penumpang sebanyak 65 orang, kapasitas kendaraan sebanyak 12 unit mobil jenis SUVdan kontainer sebanyak 6 TEU’s dengan jenis muatan berupa buah, sayur, dan daging ternak. Berdasarkan perhitungan yang telah dilakukan didapatkan ukuran utama kapal yaitu LOA = 54 m, B =16 m, B1 =4.2 m, H = 3.6 m, T =2 m. Hasil penilitian menunjukkan bahwa desain kapal katamaran 3-in-1 layak dibangung dan investasi terhadap pembangunan kapal katamaran 3-in-1 dilakukan dengan Net Present Value Rp Rp1,679,747,762, Internal Rate of Return 21%, dan Payback Period dalam empat tahun satu bulan 13 hari.
===============================================================================================================================
Since September 2015, Boom Beach Banyuwangi has been constructed by the Local Government to be a yacht quay and renamed to Boom Marina Quay, Banyuwangi which is expected to be part of world’s marine network and also to promote Indonesia’s marine tourism to the world. The quay will then be connected to Benoa Port, Bali. Yet, there hasn’t been any sea transportations operated on its traffic lane. This Final Project designed 3-in-1 Catamaran Passenger-Container-Vehicle with Point-Based Design method. By a series of design processes, has been obtained the passenger capacity of 65 persons, vehicle capacity of 12 units SUV type of car, and 6 TEU’s containers which carry fruits, vegetables, and meats; The result of this research shows that 3-in-1 Catamaran is deserved to be built and its dimensions LOA = 54 m, B = 16 m, B1 = 16 m, H = 3,6 m, T = 2 m. The investment of building this 3-in-1 Catamaran is feasible with the NPV Rp 13.917.091.275, IRR 3%, and Payback Period is 8 years 6 months and 16 days.

Item Type: Thesis (Other)
Additional Information: RSPe 623.81 Aza d-1 2020
Uncontrolled Keywords: Dermaga Boom Marina Banyuwangi, Katamaran 3-in-1, Pelabuhan Benoa Bali. Penumpang-Kontainer-Kendaraan, 3-in-1 Catamaran, Benoa Port Bali, Boom Marina Quay Banyuwangi. Pessenger- Container-Vehicle
Subjects: T Technology > T Technology (General)
V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering
Divisions: Faculty of Marine Technology (MARTECH) > Naval Architecture and Shipbuilding Engineering > 36201-(S1) Undergraduate Thesis
Depositing User: Abdullah Azam
Date Deposited: 08 Mar 2023 04:20
Last Modified: 08 Mar 2023 04:20
URI: http://repository.its.ac.id/id/eprint/73525

Actions (login required)

View Item View Item