Perencanaan Ulang Chain Conveyor Untuk Mengangkut Ampas Tebu Dengan Kapasitas 7 Ton/Jam Di PG Tjoekir

Zamani, Rahmat Zaki (2020) Perencanaan Ulang Chain Conveyor Untuk Mengangkut Ampas Tebu Dengan Kapasitas 7 Ton/Jam Di PG Tjoekir. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10211600000082-Non_Degree.pdf]
Preview
Text
10211600000082-Non_Degree.pdf

Download (2MB) | Preview

Abstract

Di PG Tjoekir dibutuhkan pesawat pengangkat untuk mengangkut bahan sisa produksi untuk memindah ampas tebu ini dipergunakan chain conveyor. Namun di PG Tjoekir didapatkan rantai yang digunakan pada chain conveyor sudah banyak berkarat sehingga menurunkan efektifitas dari chain conveyor. Dalam buku ini akan dibahas tentang perhitungan chain conveyor meliputi pemilihan rantai utama, daya yang dibutuhkan rantai, sproket penggerak juga bearing. Untuk mencapai tujuan tersebut diatas maka dilakukan studi literatur dan observasi lapangan. Setelah itu dilakukan pengambilan data dan melakukan perencanaan. Perencanaan yang dilakukan meliputi jenis rantai yang digunakan, kecepatan konveyor, besar sproket rantai utama, panjang rantai utama, perencanaan rantai dan sproket transmisi. Hasil perhitungan menunnjukkan Conveyor ini memiliki panjang rantai 23,7 meter dengan kecepatan 20 m/min menggunakan rantai nomor DK 100-152, roller jenis S, attachment gk 2. Dari data perhitungan diperlukan daya sebesar 4,442
================================================================================================================================
In PG Tjoekir, a lifting aircraft is needed to transport the remaining production materials to move the bagasse ash to the conveyor chain. However, in PG Tjoekir, the chain used in the chain conveyor has been corroded, reducing the effectiveness of the conveyor chain. In this book, we will discuss the chain conveyor calculation, including the selection of the main chain, the required power, the chain and also the shaft drive sprocket and the bearing. To achieve the above objectives, literature studies and field observations were carried out. After that data collection and planning are carried out. The planning includes the type of chain used, speed of the conveyor, large main chain sprocket, main chain length, chain planning and transmission sprocket, and bearings. The calculation results show this conveyor has a chain length of 23,7 meters with a speed of 20 m/min using a chain number DK 100-152, roller type S, attachment no 2. From the calculation data, the power is 4,442

Item Type: Thesis (Diploma)
Additional Information: RSMI 621.859 Zam p-1 2020
Uncontrolled Keywords: chain conveyor, bearing, rantai dan sproket transmisi, chain and sprocket transmission.
Subjects: T Technology > TS Manufactures > TS176 Manufacturing engineering. Process engineering (Including manufacturing planning, production planning)
Divisions: Faculty of Industrial Technology > Mechanical Engineering > 21401-(D3) Diploma 3
Depositing User: Rahmat Zaki Zamani
Date Deposited: 17 May 2023 02:07
Last Modified: 17 May 2023 02:07
URI: http://repository.its.ac.id/id/eprint/76246

Actions (login required)

View Item View Item