PT. PLN (Persero) merupakan Badan Usaha Milik Negara yang bertugas untuk mengelola bidang ketenagalistrikan untuk memenuhi kebutuhan masyarakat dalam menyediakan energi listrik di Indonesia. Listrik merupakan komoditas yang menguasai hajat hidup orang banyak, sehingga tarif dasar listrik (TDL) ke masyarakat ditetapkan oleh pemerintah. Di lain pihak, Biaya Pokok Penyediaan (BPP) tenaga listrik PT PLN yang merupakan biaya produksi energi listrik yang diproduksi sendiri menjadi tanggung jawab PT PLN. Pencapaian laba PT PLN sangat ditentukan dengan bagaimana BPP dikelola dan dikendalikan. Sampai dengan bulan Maret 2018, target BPP pembangkit PT PLN Eks-UPJB yang dikelola oleh PT PJB tidak tercapai dengan deviasi kenaikan sebesar 27,47 Rp/kWh. Kenaikan BPP tidak dapat segera diketahui faktor penyebab dan penyelesaiannya karena di lingkungan PT PJB belum memiliki metode analisis yang bisa menjelaskan faktor penyebab dan proporsinya terhadap deviasi tersebut secara komprehensif. Oleh karena itu, dilakukan penelitian dengan menggunakan metode Variance Analysis dalam proses pemilihannya. Penelitian ini diawali dengan melakukan studi literatur, pengumpulan data primer yang nantinya dijadikan acuan dalam menentukan biaya standar dan jenis variance analysis yang digunakan untuk mengetahui deviasi setiap komponan BPP dengan realisasi biaya. Hasil dari penelitian ini adalah penerapan metode Variance Analysis dan pembahasan action plan dengan Focus Group Discussion (FGD) pada pengendalian Biaya Pokok Penyediaan (BPP) berhasil memberi prioritas Rencana Kerja dan Anggaran Perusahaan (RKAP) untuk program kehandalan yaitu perbaikan rotor turbin PLTU Pacitan dan pengadaan strategic spare PLTU Paiton 9. Sedangkan prioritas untuk program effisiensi yaitu pengadaan reverse osmosis plant PLTU Pacitan dan optimasi overhaul PLTU Paiton 9.
===============================================================================================================================
PT. PLN (Persero) is a State-Owned company managing the electricity sector to meet the needs of the community in providing electricity in Indonesia. Electricity is a commodity that effects the lives of many people, so the basic electricity tariff (TDL) to the community is determined by the government. On the other hand, PT PLN's electricity main supply cost (BPP), which is the cost of producing electricity, are the responsibility of PT PLN itself. The achievement of PT PLN's profits is largely determined by how the BPP is managed and controlled. As of March 2018, the BPP target of the PT PLN Ex-UPJB plant managed by PT PJB was not achieved with an increase in deviation of 27.47 Rp / kWh. The root causes of and solutions to the increase in BPP could not be known immediately because PT PJB did not yet have an analytical method that could explain the causes and their proportions to the increasing deviation comprehensively. Therefore, this study is conducted using the Variance Analysis method in the selection process. This research begins with a literature study, primary data collection which will be used as a reference in determining the standard costs and the types of variance analysis used to determine the deviation of each BPP component with the cost realization. The results of this study are the application of the Variance Analysis method and the discussion of action plans with a Focus Group Discussion (FGD) on controlling the BPP successfully giving priority to the Work and Budget Company Plan (RKAP) priorities for the reliability program are the repair of the Pacitan CFPP turbine rotor and the procurement of the Paiton 9 CFPP strategic spare parts. While the priorities for the efficiency program are the procurement of reverse osmosis plant of the Pacitan CFPP and the overhaul optimization of the Paiton 9 CFPP.
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | RTMT 658.403 Wid p-1 |
Uncontrolled Keywords: | Biaya Standar, Pengendalian Biaya, Variance Analysis, BPP |
Subjects: | H Social Sciences > HG Finance T Technology > TS Manufactures > TS167 Costs, Industrial |
Divisions: | Faculty of Creative Design and Digital Business (CREABIZ) > Technology Management > 61101-(S2) Master Thesis |
Depositing User: | Mr Danang MW |
Date Deposited: | 18 Mar 2025 06:47 |
Last Modified: | 18 Mar 2025 06:47 |
URI: | http://repository.its.ac.id/id/eprint/76450 |
Actions (login required)
![]() |
View Item |