Tipe kontrak konstruksi untuk proyek jalan yang digunakan di
PT Pelabuhan Indonesia III (Persero) saat ini adalah dengan menggunakan jenis General Contracting. Kontrak tersebut merupakan kontrak dengan pendekatan konvensional yang mana pada sistem ini dirasakan memiliki banyak kelemahan. Kegiatan pemeliharaan jalan yang sekarang dinilai kurang efektif dengan beberapa kendala yaitu (1) Perbaikan kerusakan biasanya dilakukan sesaat ketika terjadi kerusakan; (2) Terbatasnya biaya untuk kegiatan pemeliharan;
(3) Banyaknya sumber daya manusia yang harus dialokasikan untuk perencanaan dan pengawasan pekerjaan; (4) Membutuhkan waktu yang lama mulai dari pemeriksaan kerusakan, perencanaan dan perbaikan; (5) Serta tidak dapat menjamin mutu hasil perbaikan.
Untuk memperoleh hasil proyek yang lebih optimal dan pemeliharaan dapat berjalan optimal, selain dengan cara peningkatan kegiatan pengendalian mutu oleh tim pengawas proyek, salah satu cara yang dapat dilakukan oleh PT Pelabuhan Indonesia III (Persero) adalah dengan merubah penggunaan tipe kontrak yang selama ini dilakukan dengan tipe kontrak yang inovatif. Tipe kontrak yang inovatif ini mempertimbangkan aspek kinerja hasil pekerjaan yang disebut sebagai Kontrak Berbasis Kinerja atau Performance Based Contract (PBC).
Analisa pada penelitian ini dengan menggunakan Structural Equation Modeling (SEM). Hasil yang diperoleh pada penelitian ini menunjukan bahwa variabel kesiapan penggunaan PBC dan semua indikatornya berpengaruh positif terhadap penerapan Kontrak Berbasis Kinerja atau Performance Based Contract (PBC) di PT Pelabuhan Indonesia III (Persero). Jika variabel kesiapan meningkat sebesar satu satuan dan variabel lain dianggap konstan maka variabel penerapan PBC akan bertambah sebesar 0,390.
==================================================================================================================
The type of construction contract for the road project used at
PT Pelabuhan Indonesia III (Persero) is currently using the General Contracting. The contract is with a conventional approach which in this system is felt to have many weaknesses. Road maintenance activities are now considered ineffective with several obstacles, namely (1) Damage repair is usually done shortly when damage occurs; (2) Limited costs for maintenance activities; (3) The large amount of human resources that must be allocated for planning and supervising work;
(4) Requires a long time starting from damage inspection, planning and repairs; (5) And cannot guarantee the quality of the results of repairs.
To obtain more optimal project results and maintenance can run optimally, in addition to increasing the quality control activities by the project supervisory team, one of the ways that can be done by PT Pelabuhan Indonesia III (Persero) is by changing the use of contract types that have been carried out so far. innovative type of contract. This innovative type of contract considers the performance aspects of work results called the Performance Based Contract (PBC).
Analysis in this study using Structural Equation Modeling (SEM).
The results obtained in this study indicate that the variable readiness to use PBC and all its indicators has a positive effect on the implementation of Performance Based Contracts (PBC) at PT Pelabuhan Indonesia III (Persero). If the readiness variable increases by one unit and the other variables are considered constant then the PBC implementation variable will increase by 0.390.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Kontrak Konvensional, Performance Based Contract, SEM
Subjects: T Technology > T Technology (General) > T56.8 Project Management
Divisions: Faculty of Creative Design and Digital Business (CREABIZ) > Business Management
Depositing User: Angga Tri Wibowo
Date Deposited: 06 Aug 2020 23:42
Last Modified: 24 May 2023 02:46
URI: http://repository.its.ac.id/id/eprint/77115

Actions (login required)

View Item View Item