Prakoso, Matheus Bimo Aryo (2020) Feasibility Study of Municipal Solid Waste Management System (MSW-MS) in Sidoarjo District. Other thesis, Institut Teknologi Sepuluh Nopember.
Preview |
Text
02411640000139-Undergraduate_Thesis.pdf Download (9MB) | Preview |
Abstract
Sidoarjo Municipal Solid Waste Management System (MSW-MS) currently facing a problem to fulfill their needs of Municipal Solid Waste (MSW) processing, as the data shown by Dinas Lingkungan Hidup dan Kebersihan (DLHK) of Sidoarjo district stated that their service cover only 48% of Sidoarjo total area with the amount of potentially unmanaged MSW per day reach about 83% of it or equal to 1032 ton of MSW per day. In regards to this condition, there is a need to determine a new integrated approach of MSW-MS so that MSW in Sidoarjo district can be more properly managed to reduce its potential implied expense, gain potential benefits from it, and prevent potential negative impacts from improperly managed MSW. In this research, the implementation of proposed integrated MSW-MS will be carried out by a private business entity in collaboration with DLHK of Sidoarjo district in a Public Private Partnership (PPP) scheme represented in form of Business Plan Scenario (BPS). This research focused on determining the best BPS to be implemented in Sidoarjo district which targeted to optimize implied benefits from Sidoarjo District regional government perspective as its priority but still considering BPS feasibility to be implemented by related private business. This process is done by making a financial model according to the proposed BPS that are complemented with linear regression-based for its waste generation input variable and Benefit-Cost Analysis (BCA). Feasibility for each BPS implementation for private business entity perspective determined according to its financial valuation parameters value and Benefit Cost Ratio (BCR) for DLHK of Sidoarjo district perspective. The result of it is that BPS 1 and 3 considered feasible to be implemented according to its BCR value but it needs an adjustment in several private business parameter to ensure the feasibility of its implementation in terms of private business entity perspective. It is done using sensitivity and incremental analysis which resulted that WTE plant (BPS 1) is more beneficial to be implemented in Sidoarjo district with the maximum threshold of private business entity Availability Payment (AP) escalation rate adjustment until 73% and 105% for baseline and UUJK condition respectively.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Feasibility Study, Financial Modelling, Benefit Cost Analysis, Municipal Solid Waste Management System |
Subjects: | H Social Sciences > HB Economic Theory > HB846.2 Cost benefit analysis H Social Sciences > HD Industries. Land use. Labor > HD30.24 Feasibility studies. Feasibility appraisals |
Divisions: | Faculty of Industrial Technology and Systems Engineering (INDSYS) > Industrial Engineering > 26201-(S1) Undergraduate Thesis |
Depositing User: | Matheus Bimo Aryo Prakoso |
Date Deposited: | 19 Aug 2020 14:52 |
Last Modified: | 23 Jun 2023 07:47 |
URI: | http://repository.its.ac.id/id/eprint/79682 |
Actions (login required)
View Item |